Similar Projects
Last Updated | 07/28/2022 02:35 PM |
Project Title | 2023 Electrical Materials |
Physical Address | View project details and contacts |
City, State (County) | Pierre, SD 57501 (Hughes County) |
Category(s) | Government/Public, Single Trades |
Sub-Category(s) | Misc. Buildings, Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Electrical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The material required is as follows: 15 kV Primary Power Cable Three Phase Padmount Distribution Transformers Single Phase Padmount Distribution Transformers Padmount Primary Metering Cabinet The above equipment shall be in accordance with the specifications and proposed form of contract now on file in the City offices in said City of Pierre, South Dakota, by this reference made a part hereof, as though fully set out and incorporated herein. Each bid shall be made out on a blank form furnished by the City and shall be accompanied by either (1) a cashier's check or draft or check certified and drawn on a solvent State or National bank, in an amount equal to five percent (5%) of the amount of the Bid; or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of South Dakota, in an amount not less than ten percent (10%) of the amount of the Bid. The bid security shall be made payable to the City of Pierre, South Dakota. The bid security must not contain any conditions either in the body or as an endorsement thereon. Such bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within ten (10) days after the award of contract and post a satisfactory Performance Bond. All materials shall be delivered by the dates set in the Specifications. The Pierre City Commission reserves the right to defer acceptance of any bid for a period not to exceed thirty (30) days after the date bids are received and no bid may be withdrawn during this period. The Commission also reserves the right to waive irregularities and to reject any or all bids. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |