Similar Projects
Lime Island Harbor Improvements
Infrastructure
Bidding
De Tour Village, MI 49725

Lime Island Harbor Improvements
Infrastructure
Bidding
De Tour Village, MI 49725

Construction of an Improved Dock Facility at Rock Harbor, Isle Royale National Park
Post-Bid
$1,000,000 to $5,000,000 est. value
Houghton, MI

Removal Repair or Replacement of Hawk Woods Park Marsh Boardwalk
Infrastructure
Post-Bid
Auburn Hills, MI 48326

Foundation Stabilization Repair for Piers 2, 4, 6, 8 and 10 on Grosse Ile Parkway Bridge
Results
MI

Marina Fuel System And Service Dock Replacement
Results
Cheboygan, MI

AAM - Three Rivers Dock Expansions
Renovation, Addition
Construction
Three Rivers, MI 49093

Sault Sainte Marie Carbide Dock Port
Renovation
Pending Verification
Sault Sainte Marie, MI 49783

Rehabilitation of Pier 4 at Water's Edge Marina
Infrastructure
Bidding
Grosse Ile, MI 48138

Riverside Seawall Repair at DFD Fireboat Station
Infrastructure
Post-Bid
Detroit, MI 48216

2020 Nara Boardwalk Reconstruction
Results
Less than $699,730 est. value
Houghton, MI

DNR Waterways - Water Mobility Construction
Alteration
Post-Bid
Saint Joseph, MI

Dock Repair
Results
Dollar Bay, MI 49922

Chinook Pier Redevelopment
Infrastructure
Post-Bid
Grand Haven, MI 49417

Port Austin Harbor - Dock Repairs
Results
Port Austin, MI 48467

Reported 11/24/2021 12:00 AM
Project Title

Independence Oaks Floating Dock Materials

Physical Address View project details and contacts
City, State (County) Oakland, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide lump sum proposals for floating dock systems including but not limited to 16” height floatation units, 12” height floatation units on low profile dock sections as noted, aluminum support structure, (20) connecting 2” pipe brackets and 10’ anchoring poles with auger, (2) ADA aluminum gangway w/handrail and hardware, (4) 5’ heavy duty piano hinge w/hardware, any additional hardware for complete dock system, equal to LochDock floating dock systems. Refer to attachment for length/width requirements.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents