Similar Projects
Section 5 Cell 1 Bedrock Removal & Subgrade Preparation
Infrastructure
Sub-Bidding
$191,000 CJ est. value
Binghamton, NY 13905

Environmental Services
Term Contract
Post-Bid
Binghamton, NY

Hazardous Waste Materials Disposal
Alteration
Post-Bid

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Science III Lab Asbestos Abatement
Alteration
Results
$3,000,000 est. value
Binghamton, NY 13902

Contract #1 - Asbestos and Lead-Based Paint Abatement
Term Contract, Infrastructure
Construction
$13,750 CJ est. value
Vestal, NY 13850

Contract #2 - Asbestos and Lead-Based Paint Abatement
Term Contract, Infrastructure
Construction
$13,750 CJ est. value
Johnson City, NY 13790

Soil Disposal At 29 LNA Sites
Term Contract, Alteration
Post-Bid

Old Maintenance Building Demolition
Demolition, Infrastructure
Results
$333,655 CJ est. value
Johnson City, NY 13790

Soil Disposal At Four (4) LNA Sites
Alteration
Post-Bid

Broome DDSO 4A Asbestos Abatement
Term Contract, Infrastructure
Results
$22,950 CJ est. value
Binghamton, NY 13901

Winter Demolitions
Demolition, Infrastructure
Post-Bid
$50,000 CJ est. value
Binghamton, NY 13905

Windsor Central School District 2020 District Wide Capital Project - Phase 2
Infrastructure - 60,019 SF
Results
$19,450,588 CJ est. value
Windsor, NY 13865

Pesticides, Plant Growth Regulators, Grass Seed and Sod
Term Contract
Post-Bid
Binghamton, NY 13905

Asbestos Abatement at Vacant Residential Property in Broome County, Ny
Term Contract, Infrastructure
Results
$15,400 CJ est. value
Vestal, NY 13850

Last Updated 07/19/2023 03:13 PM
Project Title

Broome DDSO-4D12 & 4D13 Bathroom Renovation

Physical Address View project details and contacts
City, State (County) Binghamton, NY 13901   (Broome County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

company would like to be considered for this project, please review the attached scope of work, scheduled the site visit with the Project Coordinator and submit your bid using the attached Certified payroll record MUST be submitted at the time of invoicing. If you need assistance understanding prevailing wages. Please contract NYS Dept. Of Labor. This is a NYS Public Works Project and Prevailing Wages MUST be paid. A New York State Department of Labor Prevailing Wage Request is submitted on behalf of OPWDD as the contracting agency. This project will be assigned an Original Wage Schedule with an assigned Prevailing Rate Case number. Selected vendor must comply with all prevailing wage regulations distributed by the NYSDOL Bureau of Public Work. Remodel existing spaces to create ADA Compliant bathrooms. The Broome DDSO reserves the right to reject any and all quotes. Provide all necessary work to create ADA compliant bathrooms in rooms 4D12 & 4D13 in building #4 on the Broome DDSOO Main Campus. 2. Contractor shall ensure that both bathrooms have a minimum of two commodes each. One of the commodes in each bathroom shall be ADA complaint. Designer shall ensure that all other fixtures are ADA complaint as well as being complaint with all relevant building codes. 3. Contractor must include the following Holders & Dispensers in the specifications: Grainger P#506K76 Toilet Paper Dispenser, NYSID P#F6659-0000-000 Hand Soap Dispenser, Bobrick P#B-3644 Recessed Waste Receptacle, Grainger P#40AY40 Sanitouch Roll Paper Towel Dispenser. 4. Contractor shall ensure that each bathroom is adequately lighted per code and all electrical work necessary to enable proper lighting that is shown on the drawings. 5. Contractor shall be responsible for all plumbing and ventilation work necessary on the drawings. Including relocation of existing floor drain(s) into the center (+/-) of each space. To help keep it out of the way of any new partitions. 6. Sub-floor sewer & drain piping shall be properly plumbed and kept free of construction debris at all times. 7. Contractor shall work with OPWDD staff to ensure that all selected floor, wall, and ceiling finishes are professional and economical. 8. The Contractor is responsible to remove all construction debris from the premises and be properly disposed of. 9. Quote shall include a start date, in days, post issuance of a PO. 10. All work to be done per NYS Building Code and Industry Best Practices. 11. All work shall have a one-year warrantee from the date of final payment.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents