Last Updated | 07/24/2023 09:38 AM |
Project Title | Magnolia Entrance Facility Utilities |
Physical Address | View project details and contacts |
City, State (County) | Bay Minette, AL 36507 (Baldwin County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $163,704 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Sealed bids will be received, opened, and publicly read by the Baldwin County Commission for the referenced Project. Project Description: The principal items of work include the following: 280 L.F. of 6-Inch DI Water Main 1,151 L.F. of 6-Inch C900 PVC Water Main (DR18) 1,010 L.F. of 1-inch Sch. 40 PVC Water Line - Installed by Open-Cut 125 L.F. of 4-inch Sch. 40 PVC Conduit for Buried Fiber Optic - Installed by Open-Cut 500 L.F. of 4-inch Sch. 40 PVC Conduit for Buried Electrical - Installed by Open-Cut and all related appurtenances as described on the plans The estimated construction cost is $275,000.00 to $350,000.00. The County requires the Project to be completed in thirty-five (35) calendar days from date of Notice to Proceed. Bidders will be required to provide Bid security in the form of a Bid Bond or cashier's check in the amount of a sum no less than five (5) percent of the Bid Price but not more than $10,000.00. All bids must be submitted in a sealed envelope bearing on the outside the name of the bidder, bidder's license number, address and name of the project. Your Bid will be required to be submitted under a condition of irrevocability for a period of Sixty (60) days after submission. The attention of bidders is called to the provisions of State Law Governing General Contractors, as set forth in Title 34, Chapter 8, Article 1, Code of Alabama of 1975, as amended; and the provisions of said law shall govern bidders insofar as it is applicable. The above-mentioned provisions of the Code make it illegal for the Owner to consider a bid from anyone who is not properly licensed under such code provisions. The Owner, therefore, will not consider any bid unless the bidder produces evidence that he is so licensed. Neither will the Owner enter into a Contract with a foreign corporation which is not qualified under State Law to do business in the State of Alabama. The attention of nonresident bidders is called to the provisions of Alabama Law, Title 39, Chapter 3, Code of Alabama 1975, as amended, relating to preference to be given to resident contractors in Alabama over nonresident contractors in the award of contracts in the same manner and to the same extent as provided by the laws of the state of domicile of the nonresident contactor, and to the requirements that the bid documents tendered by any nonresident contractor must be accompanied by "a written opinion of an attorney-at-law licensed to practice law in such nonresident contractor's state of domicile as to the preference, in any or none, granted by the law of that state to its own business entities who's principal places of business are in that state in the letting of any or all public contracts". Each Bidder, and each Subcontractor, is required to complete and submit Document 00450 - Affidavit of Immigration Compliance along with their E-Verify Program Memorandum of Understanding at the time of the Bid. No Contract will be awarded to any Bidder who does not submit the required Immigration Compliance documents. Contractor will be required to provide two (2) Owner's Protective Liability Policies. Named Insured shall be as follows: 1. Baldwin County Commission 2. CDG, Inc. See Section 00700 - General Conditions for full details. The County reserves the right to accept or reject any or all Bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |