Similar Projects
Valley View Sewer Rehabilitation - PW-27-10 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51503

30th Avenue Sewer Rehabilitation - Phase II - PW-24-08 - City Of Council Bluffs
Infrastructure
Conception
$750,000 est. value
Council Bluffs, IA 51501

Treynor Family Recreation Complex
New Construction, Infrastructure
Design
$4,650,000 CJ est. value
Treynor, IA 51575

Pavilion Railing Replacement
Infrastructure
Design
$249,500 CJ est. value
Council Bluffs, IA 51501

Pottawattamie County Election's Building Parking Lot
Infrastructure
Post-Bid
Council Bluffs, IA

First Avenue Trail Project -Trail Project
Infrastructure
Post-Bid
$2,000,000 est. value
Council Bluffs, IA 51501

PCC Patching
Infrastructure
Results
IA

Wilson Island SRA Pavement Repair
Infrastructure
Results
IA

Roberts Park Playground Replacement - PR-25-08 - City of Council Bluffs
Alteration
Conception
$545,000 est. value
Council Bluffs, IA 51501

Thomas Jefferson High School Tennis Courts Replacement
Infrastructure
Design
$350,000 CJ est. value
Council Bluffs, IA 51501

450th Street Storm Sewer Improvements
Infrastructure
Post-Bid
$148,910 est. value
Avoca, IA 51521

HMA Resurfacing with Milling
Infrastructure
Results
IA

28th Street Storm Rehab - Phase IV - PW-24-11 - City Of Council Bluffs
Infrastructure
Conception
$1,500,000 est. value
Council Bluffs, IA 51501

Cattlemen's Heritage Beef Processing Plant
New Construction, Infrastructure
Design
$54,000,000 CJ est. value
Council Bluffs, IA 51501

Valley View Dog Park, Phase II Rebid
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Council Bluffs, IA 51503

Last Updated 09/07/2022 09:09 AM
Project Title

Eastern Hills Trail Stop Park - Phase II Parking Lot

Physical Address View project details and contacts
City, State (County) Council Bluffs, IA 51503   (Pottawattamie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

MAJOR ITEMS OF WORK for this project include the following approximate quantities: 1270 SY Non-Reinforced PCC Pavement w/ Integral Curb; 1 LS Grading; 1 LS Subgrade Preparation 12"; 1 EA Water Station w/ PVC Drain Outlet, Model 'Most Dependable Fountains, Inc - 10155 SM', Color Black w/ 'Recessed Hose Bibb & Lock Door' and 'Bowl Sand Strainer' Options or Approved Equal; 180 SF Retaining Wall; 1 LS Irrigation System; 1 LS 4" Water Main Tap, 2" Meter Pit, Backflow Preventor for Irrigation , Connection to Existing Irrigation System & New Drinking Fountain; associated landscaping and seeding with hydraulic mulch. Each proposal shall be accompanied by a certified check, bid bond by a surety company registered to do business in the State of Iowa, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States in the amount of ten percent (10%) of the total bid price and made payable to the City of Council Bluffs. A copy of the certified check, bid bond, or share draft is to be uploaded in the assigned requested attachments area. If a company who has a check is awarded the bid, the City will request the physical check at that time. The certified check or share draft will be returned to the successful bidder once the agreement has been executed. Letters of credit and company or personal checks are not acceptable substitutes for a bid bond and will be cause for rejection of bid. Each bidder's proposal shall include a list of at least three (3) projects completed in the last five (5) years. These projects shall be similar in contract amount and scope of work to the proposed project. Scope of work for the proposed project includes the MAJOR ITEMS OF WORK listed above. Bidders shall also submit with their bid the phone numbers and the names of contact persons for each of the similar projects listed. No bidder may withdraw their proposal within 60 days after the bid opening. The successful bidder will be required to furnish satisfactory performance and payment bonds in the amount of one-hundred percent (100%) of the total bid price, a certificate of insurance and a certificate of equal employment opportunity and comply with minimum wage provisions as established by the U.S. Department of Labor. The work under this proposed contract shall be completed as detailed in the Instructions to Bidders. All work is to be completed on or before December 15, 2022. Work to commence within 10 calendar days from the date the Notice to Proceed is issued. The City of Council Bluffs reserves the right to reject or accept any or all bids and waive any irregularities in the interest of the City.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents