Similar Projects
Visitor and Education Center - Phase 2B
Addition - 30,000 SF
Conception
$11,600,000 est. value
Carlisle, PA 17013

Titan Well Natural Gas Access Pad
Infrastructure
Conception
Murrysville, PA 15632

St Charles Borromeo Seminary and Educational Institution and Continuing Care
New Construction, Renovation - 296,770 SF
Design
Ardmore, PA 19003

Z2da--693-20-109 Replace Underground Storage Tanks
Design
$1,000,000 to $5,000,000 est. value
Wilkes-Barre, PA 18702

Tank Abandonment for Two Sites in PA
Renovation
Post-Bid
Chester, Philadelphia, PA

Tank Abandonment for Two Sites in PA
Renovation
Post-Bid
Chester, Philadelphia, PA

Fuel Tank Replacement
Results
Lehighton, PA 18235

Proposed Fuel Tank Installation Project at the Towamensing Elementary School
Results
Lehighton, PA 18235

Rose Rent Lofts
Renovation, Demolition - 66,600 SF
Construction
$7,000,000 est. value
Chambersburg, PA 17201

Franklin County CTC Practical Nursing Facility
New Construction - 8,000 SF
Construction
$500,000 est. value
Chambersburg, PA 17202

6,000 Gallons Ultra Low Sulfur Diesel Fuel
Post-Bid
Cambridge Springs, PA

Lower State Road Tank Mixer
Results
$30,000 to $40,000 est. value
Horsham, PA 19044

Commonwealth Charter Academy at Former Macy`s Store
Renovation - 65,000 SF
Construction
$8,500,000 est. value
Homestead, PA 15120

UST System Closures at Three Sites in NJ &PA
Renovation
Post-Bid

Purchase and Removal of Propane Storage Tanks and Associated Equipment at Passyunk Plant
Results
Philadelphia, PA 19122

Reported 08/28/2021 12:00 AM
Project Title

CPI - Off-Road Fuel System

Physical Address View project details and contacts
City, State (County) Pleasant Gap, PA 16823   (Centre County)
Category(s) Education, Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Vocational School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2021, Construction Completion Expected November 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing fuel tank system in its entirety. Provide and install new fully operational diesel and gasoline Off Road Fuel System compliant with all local and state regulations. Contractors interested in responding to the RFP shall submit your intent by email to Rick Carra by August 24, 2021. Include the following in your response: Firm name, Contact name, title, telephone number, email of the primary contact. Addendums will be sent only to those who have properly responded.

Details

Vocational School, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents