Similar Projects
Reported | 06/16/2020 12:00 AM |
Project Title | Bethel Burying Ground Memorial At Wecaccoe Playground |
Physical Address | View project details and contacts |
City, State (County) | Philadelphia, PA (Philadelphia County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | $1,150,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A budget of $1,150,000 has been allocated for this opportunity. This sum is inclusive of the removal of the recreation building, the installation of a youth tennis court, the design and installation of a memorial, all artist(s) fees, insurance, fabrication, installation, travel, and all other project related expenses and ancillary site changes necessitated by the memorial and tennis court.3 Revised: August 2014 Responses should speak to the following: Memorial Concept Proposal 1. Location(s) 2. Concept/Description 3. Method of approach and procedure 4. Installation methods 5. Résumé 6. Visual images/renderings of your proposed artwork Playground Alterations 1. Removal of the recreation center building by hand 2. Installation of a youth tennis court on the site of the existing tennis court 3. Any ancillary improvements necessitated by numbers 1 and 2 above. Conservation and Maintenance Concerns 7. Choice of materials including durability 8. Maintenance requirements (including cleaning methods and frequency) 9. Vandalism concerns Budget ($1,150,000): Please detail the following: 10. Research costs 11. Building removal 12. Materials 13. Engineering Costs 14. Fabrication 15. Site Preparation 16. Installation of tennis court 17. Installation of memorial 18. Other site alterations 19. Insurance 20. Shipping 21. Contingency/Miscellaneous (and/or unanticipated costs; 10%) 22. Artist Fee (15%) Projected Time Schedule 23. Research Phase 24. Building removal 25. Fabrication Phase 26. Installation |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |