Similar Projects
Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Onsite Wastewater Treatment Systems
Term Contract
Bidding
NY

Wastewater Treatment Plant Generator and Anaerobic Digester Modifications Project
Renovation
Bidding
Highland Falls, NY 10928

Z--Renovate Sewage Treatment Plant Trickling Filter at Castle Point
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Wappingers Falls, NY 12590

Replace Wastewater Treatment Plant at Highland RC
Post-Bid
$3,325,000 to $4,650,000 est. value
Highland, NY 12528

Z1DA--Renovate Sewage Treatment Plant Trickling Filter at Castle Point VA Medical Center
Renovation
Results
$1,000,000 to $5,000,000 est. value
Wappingers Falls, NY 12590

Wastewater Treatment Facility at Amy Bull Crist Campus
Results
$1,000,000 to $1,200,000 est. value
Goshen, NY 10924

Wastewater Treatment Plant Screen Upgrade
Construction
Catskill, NY 12414

Wastewater Treatment Plant Phase I Upgrades
Construction
North Tonawanda, NY 14120

Rogers Multifamily Residential
New Construction
Pending Verification
Westhampton Beach, NY 11978

Rotating Biological Contactor (RBC) Maintenance and Repair Services
Renovation, Term Contract
Bidding
Orangeburg, NY 10962

Operation and Maintenance of the Wastewater Treatment Plant at the Brewster Central School District
Post-Bid
Brewster, NY 10509

Water Pollution Control Plant (WPCP) Solids Handling Improvements
Results
Endicott, NY 13760

WWTF Improvements Phase 2 - General Improvements
Construction
Akron, NY 14001

Metropolitan Syracuse WWTP Thickener Complex Rehabilitation
Renovation
Bidding
$4,000,000 est. value
Syracuse, NY 13204

Last Updated 03/24/2022 08:40 AM
Project Title

Water Pollution Control Plant Improvements - Phase 1A

Physical Address View project details and contacts
City, State (County) Hornell, NY 14843   (Steuben County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 1: General Construction and Contract 2: Electrical Construction The Project consists of the construction of an ultraviolet disinfection system and pole barn to house the system, installation of new piping, valves and appurtenances, electrical and process control system improvements, and site work, at the City of Hornell Water Pollution Control Plant at 69 Park Drive, Hornell, NY 14843. Contract 1 (General Construction) Work within Contract 1 of the Project includes installation of new ductile iron pipe and fittings, installation of new process valves, construction of excavation support and protection system(s). construction of a new Disinfection Building, installation, testing, and startup of new UV disinfection Equipment, installation of new water service line components, installation of a magnetic flow meter, replacement of asphalt paving and concrete sidewalk. temporary bypass pumping. construction of erosion and sediment control measures, site work, and site restoration. Contract 2 (Electrical Construction) Work within Contract 2 of the Project includes modifications and upgrades to existing panels, electrical and signal wiring and conduit, the provision of electrical and signal connections and terminations to equipment, and installation of new breakers, panels, telemetry components, and other power and signal components.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting and Coating.
Division 13 - Special Construction.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping, Common Work Results for Process Valves.
Division 46 - Water and Wastewater Equipment, Ultraviolet Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents