Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

HVAC System Renovations at Whittier Regional Vocational Technical High School
Results
Less than $150,000 est. value
Haverhill, MA

Heating and Domestic Water Systems Upgrades - Phase I at Franklin Field Development - General Bids
Results
Less than $2,592,791 est. value
Dorchester, MA

Boiler & Water Heater Replacement at Salem Police Station - General Bids
Post-Bid
Less than $220,000 est. value
Salem, MA 01970

Heating and Domestic Water Systems Upgrades - Phase I at Franklin Field Development - Sub Bids
Results
Less than $2,592,791 est. value
Dorchester, MA

City Hall Heat Pump Replacement - General Bids
Post-Bid
$410,000 est. value
Marlborough, MA

Boiler Replacement at the Charles Sumner and Maurice J. Tobin Schools - General Bids
Results
$22,368,470 est. value
Roslindale, MA 02131

Bajko Rink Addition - Filed Sub Bid
Post-Bid
Hyde Park, MA 02136

Boiler Replacement East Boston High and Hugh O'Donnell Schools - General Bids
Results
$2,950,030 est. value
East Boston, MA 02128

Heating, Ventilation and Cooling Maintenance Service
Term Contract
Post-Bid
Winchendon, MA 01475

Historical Building A/C at the Hanover Town Hall
Results
Less than $290,000 est. value
Hanover, MA 02339

Installation of a Vehicle Exhaust Extraction System
Post-Bid
Less than $30,000 est. value
Middleborough, MA 02346

HVAC Maintenance, Inspections and Repairs for the Bellingham Public Schools
Results
$170,000 est. value
Bellingham, MA 02019

Annual Burner Services
Term Contract
Post-Bid
Dedham, MA

Reported 03/29/2019 12:00 AM
Project Title

Clarksburg School Boiler Project

Physical Address View project details and contacts
City, State (County) Clarksburg, MA   (Berkshire County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $125,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Replace either one or two existing Boilers at Clarksburg School. Replacement will be a design built project.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents