Similar Projects
Water, Suspect Microbial and Water Damaged Services
Bidding
Less than $100,000 est. value
Lowell, MA 01854

Boston Road Watermain Improvements
Bidding
Billerica, MA

Water Meter Installations and Advanced Metering Infrastructure
Post-Bid
$550,000 est. value
Bedford, MA

FY2019 Robinwood Rd. Area, Woodbine Rd., and Clairemont Rd. Water Main Replacements
Post-Bid
Less than $800,000 est. value
Belmont, MA

Water Main Replacement
Results
$450,000 est. value
Wakefield, MA

Water and Sewer Main Services
Results
Ayer, MA

Ductile Iron Water Main
Bidding
Less than $350,000 est. value
Billerica, MA

2019 Lead Water Service Replacement
Post-Bid
Less than $475,000 est. value
Winchester, MA

Meadow Road Water Main Replacement
Results
$150,000 est. value
Townsend, MA

Cushing Place Undergrounding Project
Bidding
$325,000 est. value
Chelmsford, MA

Service, Maintenance and Emergency Repair to Utilities
Post-Bid
Less than $50,000 est. value
Wakefield, MA

Marlboro Street Water Main Improvements
Results
Hudson, MA

Fire Hydrants, Valve and Curb Boxes, Gate Valves, Misc. Water Supplies, Ductile Iron Pipe
Bidding
Wilmington, MA

Replacement of Suspected Lead Water Service Connections
Post-Bid
$650,000 est. value
Everett, MA

Fire Hydrants and Related Parts
Term Contract
Results
Somerville, MA

Reported 01/31/2019 12:00 AM
Project Title

Installation of Two Cleanouts and Water Jetting of French Drain at HC Solomon MHC

Physical Address View project details and contacts
City, State (County) Lowell, MA 01854   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $20,000
Plans Available from State Agency - 01/09/19 until 01/30/19
Owner View project details and contacts
Architect View project details and contacts
Description Excavate, to an approximate depth of 7'-0" +/-, in two locations along the building perimeter to install (2) two new clean out tie-ins to the existing 6" French drain system installed along the footing of the existing building. Once the cleanouts have been installed the area will need to be backfilled and graded to match the existing conditions. Once the two clean outs have been installed approximately 400'of French drain will need to be flushed of all sediment, roots, etc., to an existing manhole located along the street side of the building. All sediment will need to be taken off site to an approved dumping location. Once the French drain has been fully flushed of all sediment, roots, etc. it will require a TV inspection videotaping to determine the existing conditions to determine whether or not the drain is properly functioning or requires any repair.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents