Similar Projects
Jones Park Repurposing - 307075 - City of Cedar Rapids
New Construction
Conception
Cedar Rapids, IA 52404

Skatepark Improvements - 307248 - City of Cedar Rapids
Renovation
Conception
$200,500 est. value
Cedar Rapids, IA

Two Basketball Courts at Hughes Park
Infrastructure
Bidding
$500,000 est. value
Cedar Rapids, IA 52404

Prairie Hill Basketball Court
New Construction
Post-Bid
Marion, IA

Linn County Conservation # 06-21 - Aluminum Box Culvert Stream Crossing
Addition
Post-Bid
Central City, IA 52214

Hughes Park Phase II Improvements
New Construction
Results
Cedar Rapids, IA

Jackson Elementary Playground
New Construction
Results
Cedar Rapids, IA 52405

Hughes Park Development - 307232 - City of Cedar Rapids
New Construction
Conception
$400,000 est. value
Cedar Rapids, IA

Parks Roof Replacements
Renovation, Alteration
Post-Bid
Cedar Rapids, IA

Pedestrian Bridge at Morgan Creek Park Phase 2B
New Construction
Results
IA

TIF Cedar Lake Nature Themed Playground - 327008 - City of Cedar Rapids
New Construction
Conception
$745,000 est. value
Cedar Rapids, IA

Jones Park Restroom Facility
New Construction
Post-Bid
$275,000 est. value
Cedar Rapids, IA 52404

Veterans Stadium Field SOD Replacement Project
Renovation
Results
$450,000 est. value
Cedar Rapids, IA 52404

TIF Cedar Lake Park Amenities - 327010
Renovation
Conception
$390,000 est. value
Cedar Rapids, IA

Pickleball Courts at Jones Park Project
Renovation
Post-Bid
$400,000 est. value
Cedar Rapids, IA 52404

Reported 07/08/2022 12:00 AM
Project Title

City of Springville Emmons Recreational Park Phase 2 - Park and West Loop Trail

Physical Address View project details and contacts
City, State (County) Springville, IA   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Emmons Recreational Park Phase 2 - Park and West Loop Trail" project involves final grading of the park, softball and recreational fields, parking lots, PCC trail, water main, sanitary sewer and site restoration.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents