Similar Projects
Construction of Facilities - City of Mount Vernon
New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Mount Vernon, WA 98273

South Commercial Avenue Corridor Plan - Phase II Commercial Avenue from 14th to 34th - City of Anacortes
Infrastructure
Conception
$60,000,000 CJ est. value
Anacortes, WA 98221

SR 9/Marsh Road to 2nd Street Vic - Widening
Infrastructure
Design
$130,600,000 est. value
Mount Vernon, WA 98273

I-5 / Maddox Creek - Fish Passage
Infrastructure
Design
$15,457,000 CJ est. value
Mount Vernon, WA 98273

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

2022 Overlay Project
Infrastructure
Post-Bid
$600,000 est. value
Lenexa, Overland Park, Shawnee, KS - Burlington, WA 66216

SR 20, Rocky Creek to Granite Creek
Infrastructure
Results

Ls Resurfacing 1
Term Contract
Results
$997,219,550 est. value

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Construction
$234,432,000 CJ est. value
Kirkland, WA 98033

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Construction
$234,432,000 CJ est. value
Kirkland, WA 98033

Fidalgo Bay Road Reconstruction - City of Anacortes
Infrastructure
Conception
$9,500,000 CJ est. value
Anacortes, WA 98221

The Crossings Cottages Development
New Construction, Infrastructure
Design
$800,000 CJ est. value
Anacortes, WA 98221

Darrington Ranger District Road Maintenance
Infrastructure
Post-Bid
Marblemount, WA

2022 Overlay Project
Infrastructure
Results
$350,000 est. value
Concrete, WA

Tommy Thompson Trestle and Causeway Replacement - City of Anacortes
Infrastructure
Construction
$350,000 CJ est. value
Anacortes, WA 98221

Last Updated 10/03/2023 07:34 AM
Project Title

Reiter Foothill Trailhead

Physical Address View project details and contacts
City, State (County) Sedro Woolley, WA 98284   (Skagit County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,297,697 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: The project is located at the Reiter Road between Gold Bar and Index, Lat. 4750'4.86"N, Long: 121 36'12.60"W. The project consists of the phase 1 construction of parking lot/trailhead for Reiter Foothills Forest Trail System. The paved phase 1 parking lot includes 34 standard vehicle stalls, 40 truck and trailer stalls, 5 ADA stalls, 1 double vault toilet and 1 fenced storm water detention pond. The estimated cost of the project is $1,621,635, and the required substantial completion date is June 1, 2024. The project is located at the Reiter Road between Gold Bar and Index, Lat. 4750'4.86"N, Long: 121 36'12.60"W.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents