Similar Projects
Burns/Mather/ Cross Water Line Design And Construction - 6064-2020-04 - City of McCall
Infrastructure
Conception
$950,000 CJ est. value
McCall, ID 83638

Burns/Mather/ Cross Water Line Design And Construction - 6064-2020-04 - City of McCall
Infrastructure
Conception
$950,000 CJ est. value
McCall, ID 83638

SFSR Overlay and Chip Seal project on the Payette National Forest
Alteration
Design
$1,000,000 to $5,000,000 est. value
McCall, ID 83638

Apron Construction - Rehabilitate Hangar Taxiways - 2956-2018-07 - City of McCall
Renovation, Infrastructure
Design
$950,000 CJ est. value
McCall, ID 83638

RFP D/B - Cascade City Shop
New Construction, Infrastructure - 2,400 SF
Bidding
$3,000,000 CJ est. value
Cascade, ID 83611

McCall Field Campus
New Construction, Infrastructure
Post-Bid
$39,440,000 CJ est. value
McCall, ID 83638

Yellow Pine Waterline Replacement Project
Infrastructure
Post-Bid
$290,000 est. value
Yellow Pine, ID

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Moscow North and Moscow Alt Route
Infrastructure
Results

Big Horn Residential Development
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
McCall, ID 83638

Highway 55 Graphics Studio
New Construction, Infrastructure - 3,010 SF
Pending Verification
$800,000 CJ est. value
McCall, ID 83638

Wooley Avenue Reconstruction - City of McCall
Infrastructure
Conception
$1,625,000 CJ est. value
McCall, ID 83638

Lift Station 52 Bypass Project
Infrastructure
Post-Bid
$850,000 CJ est. value
McCall, ID 83638

ID Bor Lake Cascades (1) Dam Crest Road Improvements
Infrastructure
Results
$500,000 to $1,000,000 est. value
Cascade, ID 83611

Stor-It Self Storage / McCall
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
McCall, ID 83638

Last Updated 11/23/2022 01:33 AM
Project Title

Wooley Separated Pathway Phase II - 2859-2020-01 - City of McCall

Physical Address View project details and contacts
City, State (County) McCall, ID 83638   (Valley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $321,829 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase II of the Wooley Avenue Pathway Project: Construction of a separated pathway connection along the South side of Wooley Avenue connecting Davis Avenue with the new Wooley Boardwalk at Denali Court. Irrigation Diversion: An irrigation diversion pipe would be installed to divert excess water in the pond at Denali Court across Wooley Avenue to the Golf Course. Excess water from the water treatment plant ends up in this wetland area/pond and could be used for irrigation at the golf course. Preliminary numbers estimate that this water could offset the use of one of the two wells used to irrigate portions of the golf course. Note: Timing of this project will most likely correspond with a streets project to re-construct this section of Wooley Avenue. This project is in included in the City of McCall FY 2023 - 27 CIP. As of November 23, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents