Similar Projects
Last Updated | 03/14/2023 02:05 AM |
Project Title | Milling and Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Marianna, FL 32446 (Jackson County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $9,981,474 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: Jackson Road Name: SR 10/SR 71 Resurfacing Limits: 53020000 Project(s): 44554115201(*) Federal Aid No: N/A Project(s): 44554115202 Federal Aid No: N/A Project(s): 44554115203 Federal Aid No: N/A Total Roadway Length: 13.833 Miles Contract Days: 310 Total Bridge Length: 0.000 Miles Total Proposal Length: 13.833 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Day Standard The Improvements under this District Contract under FPID 445541-1-52-01 consist of milling & resurfacing, base work, shoulder treatment, drainage improvements, sidewalk construction, gravity wall construction, highway signing, guardrail construction, lighting installation, pedestrian signalization, ditch pavement construction, restriping Bridges Nos. 530184 and 530185, and other incidental construction on SR 10/SR 71 (US 90) from Chipola River Bridge to East of SR 71 South in Jackson County. The improvements under FPID 445541-1-52-02 consist of manhole and valve box adjustments within the Marianna City Limits on SR 10/SR 71 (US 90) from Chipola River Bridge to East of SR 71 South in Jackson County. The improvements for FPID 445541-1-52 -03 consist of a manhole and valve box adjustment within the limits of Jackson County on SR 10/SR 71 (US 90) from Chipola River Bridge to East of SR 71 South Prequalification is Required to Bid on This Project. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order : 001 - Milling and Resurfacing |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |