Similar Projects
Interactive LED Displays
Bidding
Less than $823,989 est. value
Statesboro, GA

City Hall Generator Transfer Switch Installation
Bidding
Milton, GA 30004

Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

BCCCA HVAC and Lighting Replacement
Post-Bid
Cartersville, GA 30121

Mechanical Electrical IDIQ
Results
$500,000 to $1,000,000 est. value
Robins Afb, GA 31098

Power Distribution Material (Transformers)
Results
Less than $668,019 est. value
College Park, GA

Whitlock Park Field Lighting
Bidding
Newnan, GA 30265

Engine and Generator Maintenance and Repair Services
Term Contract
Post-Bid
GA

Water Plant Pump 5 Emergency Generator and ATS
Results
Less than $60,000 est. value
Buford, GA 30518

Boggs Transformer Replacement and Switchgear Improvements
Bidding
GA 30318

Holland Plant Boiler Power Separation
Post-Bid
Atlanta, GA 30313

Airfield Electrical Improvements
Results
Folkston, GA

Automatic Transfer Switches for Portable Generator
Bidding
Brunswick, GA 31520

Energy Conservation Services
Post-Bid
Lincolnton, GA 30817

GSOU/Armstrong Campus Student Union Generator
Results
Savannah, GA 31419

Last Updated 04/03/2020 04:17 AM
Project Title

Conversion of High Bay Gymnasium Lights to LED Light Source in 2 Gymnasiums at Central Park Recreation Center

Physical Address View project details and contacts
City, State (County) Cumming, GA 30040   (Forsyth County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Two Gymnasiums located at Central Park Recreation Center (2300 Keith Bridge Road, Cumming, GA 30040) to have LED Light Source installed with: 1.32 Cree KBL fixtures 2.Proper mountings to fit existing locations 3.Utilizing existing electrical controls and mounting locations 4.Removal and disposal of existing light fixtures and equipment 5.Installation can be completed during normal operating hours

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents