Similar Projects
Douglas County Fort Street Improvements, 208th Street to 214th Street (Grading, PCC Paving, Storm Sewer and Erosion Control)
Infrastructure
Bidding
Omaha, NE

Richard Plautz Crane Viewing Site Trail Improvements
Infrastructure
Post-Bid
$320,000 est. value
Grand Island, NE

Elk Creek Channel Stabilization
Infrastructure
Post-Bid
Omaha, NE

Gilmore-Sarpy Avenue Green Infrastructure 2021
Infrastructure
Results
Omaha, NE 68107

NP Dodge Park Marina - Marina Wall Repair 2021
Infrastructure
Results
Omaha, NE 68112

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Post-Bid

Culvert Maintenance 2021 - Phase II
Infrastructure
Results
Lincoln, NE

Nemaha County Courthouse Foundation Restoration - Drainage
Infrastructure
Post-Bid
Auburn, NE 68305

117th Street and State Street Improvements (Grading, Paving and Erosion Control)
Infrastructure
Results
Omaha, NE 68112

Bank Stabilization and Bridge Repairs
New Construction, Infrastructure
Post-Bid
Endicott, NE

Retaining Wall Replacement at 19th Street North of Pierce Street
Infrastructure
Results
NE

Street Improvement District 2022-1
Infrastructure
Post-Bid
Hastings, NE

Channel Stabilization of County Bridges H-001 and W-014
Infrastructure
Results
Lincoln, NE

West High School Softball Field Drainage Improvements
Infrastructure
Post-Bid
Omaha, NE 68135

2022 FY County Culvert Pipe
Infrastructure
Results
Lincoln, NE

Last Updated 03/04/2022 01:32 AM
Project Title

i-80 Districts 1 and 4 District wide Culverts

Physical Address View project details and contacts
City, State (County) (Hamilton, Seward Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Group 1 Grading 0001 0030.00 Mobilization 1.000 Lump 0002 1009.00 General Clearing And Grubbing 1.000 Lump 0003 1011.00 Water 20.000 Mgal 0004 1030.00 Earthwork Measured In Embankment 1392.000 Cy 0005 1041.00 Salvaging And Placing Topsoil 6038.000 Sy 0006 1102.00 Remove Asphalt Surface 842.000 Sy 0007 7017.00 Remove Guardrail 2112.000 Lf Group 4 Culverts 0008 0030.00 Mobilization 1.000 Lump 0009 4044.00 Preparation Of Structure At Station 103+32.00 1.000 Each 0010 4044.00 Preparation Of Structure At Station 110+82.00 1.000 Each 0011 4044.00 Preparation Of Structure At Station 203+18.00 1.000 Each 0012 4044.00 Preparation Of Structure At Station 270+48.00 1.000 Each 0013 4051.01 Excavation For Box Culverts 362.000 Cy 0014 4101.06 Class 47b-3000 Concrete For Box Culvert 144.620 Cy 0015 4151.00 Reinforcing Steel For Box Culvert 16363.000 Lb 0016 8010.03 Crushed Rock For Base Course 48.050 Cy Group 5 Seeding 0017 0030.50 Mobilization 1.000 Lump 0018 1111.05 Remove Silt Fence 640.000 Lf 0019 l006.00 Cover Crop Seeding 1.500 Acre 0020 l019.13 Erosion Control, Class 1d 5462.000 Sy 0021 l019.20 Erosion Control, Class 2a 889.000 Sy 0022 l022.11 Fabric Silt Fence-Low Porosity 800.000 Lf 0023 l022.73 Silt Fence Cleanout 1600.000 Lf Group 10 General Items 0024 0001.07 Surveillance Of Temporary Traffic Control Devices 100.000 Day 0025 0001.08 Barricade, Type Ii 9325.000 Bday 0026 0001.10 Barricade, Type Iii 1125.000 Bday 0027 0001.75 Temporary Sign Day 250.000 Each 0028 0001.90 Sign Day 7200.000 Each 0029 0002.97 Flashing Arrow Panel 30.000 Day 0030 0020.00 Training 100.000 Hour 0031 0030.00 Mobilization 1.000 Lump 0032 9110.01 Rental Of Loader, Fully Operated 5.000 Hour 0033 9110.03 Rental Of Dump Truck, Fully Operated 5.000 Hour 0034 9110.07 Rental Of Skid Loader, Fully Operated 5.000 Hour 0035 9110.27 Rental Of Crawler Mounted Hydraulic Excavator, Fully Operated 5.000 Hour 0036 l022.70 Silt Trap 16.000 Each 0037 l022.75 Temporary Silt Check 600.000 Lf 0038 l860.50 Environmental Commitments - Contractor Compliance 1.000 Lump 0039 l860.51 Environmental Incentive 1.000 Each 0040 l860.52 Environmental Disincentive 1.000 Cday

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents