Similar Projects
Solar Panels on Roof
Design
Berkeley Heights, NJ 07922

Plumber & Electrician 2022
Term Contract
Bidding
Scotch Plains, NJ

Licensed Electrician
Post-Bid
Plainfield, NJ 07060

Led Price Sign Fabrication & Installation At Twenty-Four (24) Lna Service Stations
Post-Bid

Replacement/Retrofit of Panelboards at Plainfield High School, Hubbard Middle School, Cedarbrook Elementary School and 504 Madison
Results
Plainfield, NJ 07060

Electrical Service and Repair
Term Contract
Results
$101 est. value
Plainfield, NJ 07063

Camera Replacement
Post-Bid
Plainfield, NJ 07060

Developer of Photovoltaic Systems on Facilities and Lands
Results
Kenilworth, NJ 07033

2021 Electrical Services
Term Contract
Post-Bid
Clark, NJ 07083

Electrician and Electrical Services
Results
New Providence, NJ 07974

Plumber and Electrician Services
Post-Bid
Scotch Plains, NJ

Electrical Repairs Contract
Results
$101 est. value
Linden, NJ 07036

General, Electrical, Plumbing, Building and Yard Emergency Services At LNA In NY, NJ & PA
Renovation
Post-Bid
Albany, NY

Kean University Vaughn-Eames Electrical Service Upgrade
Results
Union, NJ 07083

Furnish and Deliver Two (2) Traveling Bridge Control Panel Replacements
Post-Bid

Reported 12/11/2021 12:00 AM
Project Title

Roof Replacements and Repairs

Physical Address View project details and contacts
City, State (County) Rahway, NJ 07065   (Union County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect - 11/22/21
Owner View project details and contacts
Architect View project details and contacts
Description

At Franklin Elementary School, the scope of work for this project is roof replacement on the 1922 Original Building. This scope includes, but is not limited to, the removal of all insulation, membranes & flashings, and metal trim & coping caps, replacement of all drains, and raising existing mechanical equipment to accommodate new insulation heights At Madison Elementary School the scope of work for this project includes a full replacement of the roof system on the select portions of the 1954 Original Building. The 1954 Building includes 2 different roofing systems, which are to be replaced: an asphalt shingle roof and low slope roof. The scope includes, but is not limited to, the replacement of insulation, membranes & flashings, asphalt shingles, metal trim & coping caps, replacement of all drains, and raising existing mechanical equipment to accommodate new insulation heights. At Roosevelt Elementary School the scope of work for this project includes a full roof replacement on the 1958 Original Building. This scope includes, but is not limited to, the removal of all insulation, membranes & flashings, and metal trim & coping caps, and raising existing mechanical equipment to accommodate new insulation heights. At Rahway High School the scope of work for this project includes a roof edge repair at the 2011 addition, parking lot side. Repairs include, but are not limited to, the removal and reinstallation of the roof edge and associated fascia extenders, which are currently not properly secured to the building perimeter.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents