Similar Projects
Bubble Room Coin-Operated Laundry
New Construction, Renovation - 4,203 SF
Conception
Shawnee, KS 66203

Fire Station #1 Reconstruction - PB1823 - City Of Overland Park
New Construction
Conception
$13,000,000 est. value
Overland Park, KS 66204

Lenexa Justice Center Renovation
Renovation
Design
$73,000,000 est. value
Lenexa, KS 66219

City Hall Environmental Systems Renovation and Roof - 6-C-016-19 - City of Olathe
Renovation
Design
$2,500,000 est. value
Olathe, KS 66061

2021 On-Call Construction Services
Post-Bid
Shawnee, KS

Owner's Representative Services Lenexa Justice Center
New Construction
Post-Bid
Lenexa, KS

Leawood Fire Station #1
New Construction
Results
Leawood, KS 66211

Leawood Parks Maintenance Facility
New Construction
Results
Leawood, KS

New Operations Service Center
New Construction
Pending Verification
Olathe, KS

Olathe Police Headquarters Expansion - Phase 2
Addition - 30,000 SF
Design
$13,800,000 CJ est. value
Olathe, KS 66061

On Call Construction Services
Renovation, Term Contract
Post-Bid
Mission, Olathe, KS 66202

City Hall Improvements - Phase 1
Renovation
Results
Merriam, KS 66202

Eagleton Courthouse Firestopping
Renovation
Post-Bid

Owner's Representative Services
New Construction
Post-Bid
Shawnee, KS 66216

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Last Updated 08/18/2022 10:34 AM
Project Title

Public Safety Complex - City of Lenexa

Physical Address View project details and contacts
City, State (County) Lenexa, KS 66215   (Johnson County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall, Fire/Police Station, Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $70,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been identified. As of August 18, 2022, the project is in final design. Information regarding general contractor selection timeline has not been released. Further details regarding design and construction timelines has not been disclosed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors, Entrances and Storefronts, Entrances, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Multiple Seating.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents