Similar Projects
New Business and Economics Building
New Construction - 221,000 SF
Construction
Less than $91,500,000 est. value
Morgantown, WV

Hodges Hall
Post-Bid
Morgantown, WV 26506

WVU Job Order Contracting Services
Term Contract
Post-Bid
Morgantown, WV 26506

Multi-Vendor, Open-End Contract for a General Contractor Services
Term Contract
Results
Shepherdstown, WV 25443

Jackson's Mill Steam Building
Results
Weston, WV 26452

Turnkey Construction of A New Shooting Sports Venue
Results
$429,100 est. value
Morgantown, WV 26506

Jackson's Mill Yurts Bath House Addition
Addition
Results
Morgantown, WV 26506

Campbell Hall 4th Floor Renovation
Construction
$614,700 est. value
West Liberty, WV 26074

Development of Kenamond and Turner Halls, Dining Hall, Gardiner Hall and Perimeter Grounds on the East Campus
Results
Shepherdstown, WV 25443

WVU HSC Dental Clinic Renovation
Renovation
Results
Morgantown, WV 26506

HSC Human Gift Registry Relocation Project
Renovation
Results
Morgantown, WV 26505

Puskar Center Silver Lot Improvements
Post-Bid
Morgantown, WV 26505

Radiography Lab Construction
New Construction
Bidding
Wheeling, WV

Last Updated 08/10/2020 09:09 AM
Project Title

Animal Research Facility Expansion - Renovation of Two Existing Teaching Laboratories

Physical Address View project details and contacts
City, State (County) Huntington, WV 25755   (Cabell County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Expansion of the existing Animal Research Facility through the renovation of two existing teaching laboratories and a portion of a public corridor on the Ground Floor of the Robert C. Byrd Biotech Center at Marshall University. The Facility is a critical and integral part of the various medical and other research endeavors of the University. The approximate interior Project area is 3,900 square feet. A new service walkway with access from the existing interstitial service floor (above the Ground Floor) is also a part of the Project. Work includes selected demolition, under-slab piping rerouting, concrete slabon-grade patching, interior concrete masonry partitions, light-gage metal floor framing, metal walkway grating and pipe railing, stainless steel door frames, fiberglass doors, resin epoxy flooring, gypsum board ceilings, epoxy painting, wall protection, HVAC modifications including control systems, plumbing, laboratory gas piping, lighting, electrical and telecommunications.

Details

1 College/University, 3,900 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents