Similar Projects
Eastern Promenade and Lyman Moore School Tennis and Basketball Court Resurfacing
Results
Less than $50,000 est. value
Portland, ME

General Contractor Veteran's Plaza Project
Results
Brunswick, ME

Skate Park Design and Installation
Results
Less than $125,000 est. value
Bangor, ME 04401

Redbank Village Field Improvements
Results
Less than $75,000 est. value
South Portland, ME

Kate Furbish Elementary School Playground
Results
Brunswick, ME

Track Replacement
Results
Skowhegan, ME

Installation of a Futsal Court
Results
Less than $110,000 est. value
Portland, ME

York High School Tennis Courts Demolition and Reconstruction
Post-Bid
York, ME

Play Structure Replacement - Chapin and Hayford Parks
Results
Less than $225,000 est. value
Bangor, ME 04401

Community Park - Phase 2
Results
Windham, ME 04062

Tennis Court Repairs
Results
Lewiston, ME 04240

Restoration of Atlantic Avenue Park
Results
Old Orchard Beach, ME

Construction of Concrete Skatepark
New Construction - 10,000 SF
Results
South Portland, ME

Skatepark Specialty Construction
Post-Bid
Kennebunk, ME

Last Updated 05/05/2021 09:14 AM
Project Title

Hudson Bus Site Playing Field

Physical Address View project details and contacts
City, State (County) Lewiston, ME   (Androscoggin County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the Hudson Bus Site Playing Field shall consist of, but not be limited to, the complete and satisfactory construction of an all-purpose playfield, chain link fence and associated paved parking. Construction includes raising the site grade by approximately two feet. A geotextile separation material of orange color is needed between the existing site soils and additional clean fill material. The City has stockpiled approximately 3,500 cubic yards (CY) of clean common borrow to be used in the site fill. The playfield includes a 10-foot high chain link fence and gates. Base bid for the parking lot is for standard paving and gravel depths per the detail on the site plans. Base Bid also includes a shallow swale where the stomwater pond is shown with the culvert inlet cored into the existing catch basin.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents