Similar Projects
Cottage 1 and 2 Demolition and Restoration
Demolition, Infrastructure, Alteration
Bidding
$440,000 est. value
Union Grove, WI 53182

Cottage 16 Demolition and Restoration
Demolition, Infrastructure, Alteration
Bidding
$1,200,000 est. value
Union Grove, WI 53182

Schroeder Road
Post-Bid
WI 53139

City Resurfacing
Infrastructure
Post-Bid
$1,600,000 to $2,100,000 est. value
Racine, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 City Resurfacing
Results
$500,000 to $700,000 est. value
Racine, WI

2022 Assessable Streets and Alleys
Infrastructure
Post-Bid
$2,000,000 est. value
Racine, WI

Asphalt Milling Services
Results
Racine, WI

2022 Paving Program
Infrastructure
Post-Bid
Mount Pleasant, WI

Full-Depth Concrete Sawing
Results
Racine, WI 53400

Road Crack Repair
Infrastructure
Post-Bid
Burlington, WI

2021 Street Improvement Program
Results
Burlington, WI 53105

Road Work 2022
Infrastructure
Post-Bid
$376,000 est. value
Burlington, WI

Pavement Restoration Various Locations
Results
$350,000 est. value
Racine, WI 53400

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Last Updated 06/27/2022 05:56 AM
Project Title

Construction of the North Milwaukee Street Repaving Project

Physical Address View project details and contacts
City, State (County) Waterford, WI 53185   (Racine County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $158,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Waterford, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway. VILLAGE OF WATERFORD, WISCONSIN 1. Time and Place of Opening Bids. 2. Description of Work. The proposed construction consists of full depth milling and repaving approx. 19,900 SY of North Milwaukee Street from Main Street to the Village northern limits, and other miscellaneous items of work. This is a Local Road Improvement Program (LRIP) Allocation Project. 3. Information for Bidders. All pertinent documents may be examined at the Village Hall at 123 North River Street, Waterford, WI or on the internet. No hard copy/paper Bidding Documents will be provided. Documents can only be purchased through Quest CDN. 4. Rejection of Bids. The Board of Trustees reserves the right to reject any or all Bids and to waive technicalities. Unless the Bids are rejected for good cause, award of contract shall be made to the lowest responsible and responsive Bidder. Work shall not begin until July 6, 2022. The Work will be substantially completed on or before September 30, 2022, and completed and ready for final payment in accordance with paragraph 1.11 of the Supplementary Conditions on or before December 2, 2022.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents