Similar Projects
Recreation Center Drainage and Tennis Center Court Improvements
Bidding
Orange Beach, AL 36561

Drainage Improvements on Fernwood Drive West
Bidding
Bay Minette, AL 36507

Fels Av/George St Drainage Improvment
Post-Bid
Fairhope, AL

Magnolia Springs Pavement and Drainage Rehab Project
Post-Bid
Magnolia Springs, AL

Storm Drainage Improvements
Results
Less than $200,000 est. value
Elberta, AL

Erosion Control and Stabilization of Rock Creek
Results
Fairhope, AL

New Saltwater Drainline at Claude Peteet Mariculture Center Gulf Shores
Post-Bid
Gulf Shores, AL

Patrician Drive Drainage Improvements
Results
Spanish Fort, AL

2019- N-Montclair Loop Ditch Stabilization
Post-Bid
Daphne, AL

Magnolia Springs Pavement and Drainage Rehabilitation Project
Results
Magnolia Springs, AL

Waites Lane and Sara Avenue Drainage Improvement
Post-Bid
$100,000 to $250,000 est. value
Spanish Fort, AL

Art Center Shoreline Stabilization and Boardwalk
Results
Less than $64,727 est. value
Orange Beach, AL

Lackawanna Drainage Improvement
Post-Bid
$150,000 to $475,000 est. value
Spanish Fort, AL

Concrete Pipe
Term Contract
Results
Daphne, AL

Gulf of Mexico Artificial Reef Construction Project
Post-Bid
Gulf Shores, AL 36457

Reported 11/01/2019 12:00 AM
Project Title

New Substation Site Work and Retaining Wall at Nichols Avenue and Young Street

Physical Address View project details and contacts
City, State (County) Fairhope, AL 36532   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The work consists of Site Grading, Drainage and Retaining Wall Installation Improvements to the Site of a New Substation for Fairhope Utilities Electric Department, Fairhope, AL., located at 621 Nichols Avenue.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents