Similar Projects
Automated Metering Infrastructure
Bidding
Temple, GA

Water Main Replacement
Infrastructure
Bidding
Camilla, GA

Debbie Lane Water Line Replacement
Post-Bid
Less than $130,000 est. value
Flowery Branch, GA

Utility Extension to Serve Peach County High School
Post-Bid
Fort Valley, GA

Manget Street at Lakewood Drive Water and Sanitary Sewer Relocation
Results
Less than $357,198 est. value
Marietta, GA 30060

Blanchard Water Treatment Plant Lift Station
Results
Evans, GA 30809

Valve Boxes and Risers (Three (3) Year Multiyear Contract)
Term Contract
Bidding
Stone Mountain, GA 30083

Large Water Meter Testing
Term Contract
Post-Bid
Woolsey, GA 30214

Fire Hydrant and Gate Valves
Results
Atlanta, GA 30303

State Route 20 Widening Water Line Relocation - Scott Road to Hill Road
Infrastructure
Bidding
GA

Water System Improvements
Post-Bid
Less than $1,050,000 est. value
Pavo, GA 31778

Water System Improvements Old Alabama Road Utility Relocation - Phase I
Results
GA

Utilities Location Services
Infrastructure
Bidding
Atlanta, GA

Metal Aluminized-Coated Pipe Annual Contract
Term Contract
Post-Bid
Gainesville, GA

Fire Hydrants
Results
Less than $27,779 est. value
College Park, GA 30337

Last Updated 09/10/2021 09:10 AM
Project Title

CDBG Water System Improvements

Physical Address View project details and contacts
City, State (County) Summerville, GA   (Chattooga County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: Under this project, the Contractor shall furnish all labor, equipment and materials necessary to construct the proposed water system improvements as shown on the construction drawings. More specifically, the work shall consist of +/- 8,900 L.F. of 6” PVC Water Main, +/- 1,000 L.F. of 8” PVC Water Main, the transfer of approximately 61 services, and the replacement of all service tubing from the meter to the home at 55 of those services. Work will also include the installation of valves, fittings, fire hydrants, pavement patch, erosion and sediment control, grassing and all other appurtenances necessary for a complete installation.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents