Similar Projects
Last Updated | 10/13/2020 05:56 PM |
Project Title | Reinforced Concrete Deck Bridge |
Physical Address | View project details and contacts |
City, State (County) | Fairfield, IL 62837 (Wayne County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove existing pipes and construct new triple span continuously reinforced concrete deck bridge with approaches. 0.4 Acre Seeding, Class 2 (Special) 44 Ton Aggregate Ditch (Special) 1 L Sum Traffic Control and Protection (SPL) 0.05 Acre Tree Removal, Acres 425 cu yd Earth Excavation 180 cu yd Channel Excavation 89 Ton Porous Granular Embankment 250 Ton Stone Dumped Riprap, Class A4 535 Ton Aggregate Base Course, Type B 1 Each Removal of Existing Structures 34.4 cu yd Concrete Structures 68.4 cu yd Concrete Superstructures 10.6 cu yd Concrete Encasement 185 sq yd Protective Coat 30,690 Pound Reinforcement Bars, (Epoxy Coated) 101 Foot Steel Railing, Type S-1 320 Foot Furnishing Steel Piles HP 10X42 320 Foot Driving Piles 2 Each Test Pile Steel HP 10X42 1 Each Name Plates 38 Foot Pipe Culverts, Class D, Type 1 15 4 Each Terminal Marker - Direct Applied Project Location: 1.9 miles northwest of Barnhill, IL |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |