Similar Projects
SR 20/Tributary to Thornton Creek - Culvert Replacement
Infrastructure
Conception
$871,000 CJ est. value
Twisp, WA 98856

Salmon Meadows Road Rehabilitation
Infrastructure
Design
$1,000,000 CJ est. value
Conconully, WA 98855

Salmon Meadows Road Rehabilitation
Infrastructure
Design
$1,000,000 CJ est. value
Conconully, WA 98855

Channel Realignment and Bank Protection in Salmon Creek
Infrastructure
Bidding
$400,000 CJ est. value
Nespelem, WA 99155

US 97, S of Oroville - Roadway Repair
Infrastructure
Bidding
$1,250,000 CJ est. value
Riverside, WA 98849

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Central Avenue ,Main Street Resurfacing and Deerpath ,Kay Water Main Improvements
Infrastructure
Results
$600,000 to $700,000 est. value
Oroville, WA

Lower Pine Street Improvements
Infrastructure
Results
$330,000 est. value
Okanogan, WA

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

RFP Contractor - Sediment Abatement and Reduce Lateral Channel Migration on Omak Creek
Infrastructure
Bidding
$325,000 CJ est. value
Nespelem, WA 99155

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Okanogan - OMAK Pavement Maintenance
Infrastructure
Bidding
$413,000 CJ est. value
Okanogan, WA 98840

Last Updated 06/21/2023 02:01 PM
Project Title

Town of Twisp SPCC Overlay

Physical Address View project details and contacts
City, State (County) Twisp, WA 98856   (Okanogan County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $373,230 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of construction and alteration of 5th Avenue from Glover Street to Bridge Street, Lincoln Street from 3rd Avenue to 5th Avenue, and 4th Avenue from Glover Street to Lincoln Street, by replacing the subgrade section in specified areas, performing a complete overlay, and other items necessary to complete the Work included in the Project. Estimate value is $400,000 to $500,000. Estimate ranges must not be used as a basis for bid preparation. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents