Similar Projects
Detention Pond Improvement - Pond 2 - PWFC003.0-16 - Village of Mount Prospect
Infrastructure
Conception
$835,000 CJ est. value
Mount Prospect, IL 60056

Detention Pond Improvement - Pond 6 - PWFC004.0-16 - Village of Mount Prospect
Infrastructure
Conception
$305,000 CJ est. value
Mount Prospect, IL 60056

Innovation Center Build-Out Phase 01
New Construction
Bidding
$1,000,000 CJ est. value
Evanston, IL 60201

Construction Services for 51st Street Yard Coach Maintenance Building Demolition
Demolition, Infrastructure
Sub-Bidding
$60,000 CJ est. value
Chicago, IL 60615

Parkway Tree Maintenance and Silver Maple Removal Contract
Term Contract
Sub-Bidding
Elk Grove Village, IL 60007

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Pre-Demolition Asbestos Building Components Abatement
Alteration
Post-Bid
Elk Grove Village, IL 60007

Asbestos Abatement at Jefferson Elementary School
Alteration
Results
Niles, IL 60714

Tefft MS Fire Alarm Replacement, First and Second Floor Asbestos Abatement
Alteration
Results
Streamwood, IL 60107

Detention Pond Improvement - Pond 6A - PWFC005.0-16 - Village of Mount Prospect
Infrastructure
Conception
$305,000 CJ est. value
Mount Prospect, IL 60056

Phase 3 Engineering Services - Des Plaines Trail Improvements
Term Contract, Alteration
Post-Bid
Chicago, Rosemont, IL 60677

Lyons Township HS 2022 Asbestos Abatement
Alteration
Results
La Grange, IL 60525

Abatement at Glen Grove Equestrian Center
Alteration
Post-Bid
Chicago, IL

2021 Capitol/Operations - Citywide PKC-6 (Forest Glen)
Renovation
Results
$6,533,000 CJ est. value
Chicago, IL 60646

Ford Heights Green Streets Project
Alteration
Post-Bid
Ford Heights, IL

Last Updated 05/14/2023 12:31 PM
Project Title

100 Area Demolition (Coal Plant)

Physical Address View project details and contacts
City, State (County) Lemont, IL 60439   (Cook County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the furnishing of all materials, labor, supervision, equipment, tools, and appurtenances necessary to demolish, remove and dispose of the Coal Handling Plant at Argonne National Laboratory 100 Area. The work includes but not limited to Pre-Construction documentation assembly and submission, asbestos abatement and removal, demolition of conveyers as well as above and below grade structures. Backfill and compaction of remaining subgrade structure is required. The Contractor is responsible for implementing work in compliance with approved Contractor health and safety program, Job Safety Analysis, engineering demolition survey, and Laboratory Integrated Safety Management System. All related documentation can be accessed through the below Password Protected Link. To obtain the password please email the Rob Kman (kman@anl.gov) for access. Box Link: https://anl.box.com/s/zdveo9ubg32ijo8sfnhgpdg0gw2ml4b5

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents