Similar Projects
Last Updated | 10/02/2020 01:47 PM |
Project Title | Bridge Repairs and Maintenance at Various Locations in Division 11 |
Physical Address | View project details and contacts |
City, State (County) | (Alleghany, Ashe, Avery, Caldwell, Surry, Watauga, Wilkes, Yadkin Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1 SP Mobilization 10 EA 2 800 Mobilization - Emergency 5 EA 3 SP Silicon Joint Replacement (1” wide or less) 1,000 LF 4 SP Silicon Joint Replacement (1” to 2” wide) 1,000 LF 5 SP Silicon Joint Replacement (greater than 2” wide) 1,000 LF 6 SP Evazote Joint Replacement 1,000 LF 7 SP V-Seal 300 Expansion Joint Replacement 500 LF 8 SP V-Seal 400 Expansion Joint Replacement 500 LF 9 SP Joint Repair using Elastomeric Concrete 100 CF 10 SP Asphalt Joint Repair/Replacement (18”-24” wide, w/ plate) 300 CF 11 SP Concrete/ASPHALT Deck Repair Fibrescrete B 15,000 LB 12 SP Concrete/ASPHALT Deck Repair Fibrescrete G 15,000 LB 13 SP Class II Concrete Deck Repairs – HES Concrete (0 – 15 sf) 50 SF 14 SP Class II Concrete Deck Repairs – HES Concrete (more than 15 sf) 100 SF 15 SP Slab Leveling, Undersealing and Voidfilling 6,000 LB 16 SP Soil Stabilization 400 GAL 17 SP Structural Foam Void Fill/Stabilization 200 GAL 18 SP Placement of One Coat Epoxy Overlay 15,000 SF 19 SP Placement of Two Coat Epoxy Overlay 25,000 SF 20 SP Crack Sealing (Without Router or Diamond Saw) 40,000 LB 21 SP Crack Sealing (With Router or Diamond Saw) 20,000 LB 22 SP Temporary Lane Closure (2-Lane, 2-Way Roadway) 30 EA 23 SP Temporary Lane Closure (Multi-Lane Roadway) 30 EA 24 SP Lane Closure Shift (Multi-Lane Roadway) 14 EA 25 SP Nighttime Temporary Lane Closure (2-Lane, 2- Way Roadway) 30 EA 26 SP Nighttime Temporary Lane Closure (MultiLane Roadway) 30 EA 27 SP Nighttime Lane Closure Shift (Multi-Lane Roadway) 14 EA |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |