Similar Projects
Sutter Street Mixed-Use
New Construction, Infrastructure - 15,853 SF
Design
$7,000,000 CJ est. value
San Francisco, CA 94109

401 South Van Ness Avenue Residential Development
New Construction, Infrastructure - 7,100 SF
Design
$1,945,400 CJ est. value
San Francisco, CA 94102

RFQ Contractor - Research and Veterinary Medical Unit Facility, Building 40, San Francisco Veterans Affairs Medical Center
Demolition, LEED Certification, New Construction, Infrastructure, Renovation - 113,000 SF
Bidding
$250,000,000 CJ est. value
San Francisco, CA 94121

City Distribution Division Campus at 2000 Marin
New Construction, Demolition
Post-Bid
$225,000,000 est. value
San Francisco, CA 94124

Process Control Systems Integrator (PCSI) Supply and Installation
New Construction
Post-Bid
San Francisco, CA

Biosolids Digester Facility - Building 610 Wave 1
New Construction
Results
$939,000,000 est. value
San Francisco, CA 94124

SF State Science Replacement Building - Earthwork
Infrastructure
Results
San Francisco, CA

Howard Street Mixed-Use
New Construction, Infrastructure - 117,400 SF
Construction
$20,000,000 CJ est. value
San Francisco, CA 94103

Porsche TI / San Francisco
Renovation, Infrastructure - 70,902 SF
Construction
$2,000,000 CJ est. value
San Francisco, CA 94103

3rd Street Residential Development
New Construction, Infrastructure
Pending Verification
$17,365,000 CJ est. value
San Francisco, CA 94124

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Herz Playground Recreation Center - 2020 Bond - City of San Francisco
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
San Francisco, CA 94134

Southeast Plant New Headworks Construction - Scope III
New Construction
Post-Bid
$300,000 est. value
San Francisco, CA 94124

Water Pollution Control Plant Building 042 Primary Clarifier Improvements
Renovation
Results
$6,500,000 to $7,000,000 est. value
San Francisco, CA

South San Francisco Bay Shoreline
Infrastructure
Construction
$129,801,500 CJ est. value
San Francisco, CA 94103

Last Updated 01/13/2023 03:12 PM
Project Title

Biosolids Digester Facilities -T-01.02 - Commissioning & Startup Services

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94103   (San Francisco County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Design Development, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $28,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

RFQ/RFP release timeline is third quarter 2024. Direct all inquiries to the JV Construction management team.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents