Similar Projects
Water Line on Loch Lomond, Loch Ness And Dundee to Inverness - City of Rawlins
Infrastructure
Conception
$394,000 est. value
Rawlins, WY

Gregory Lane (SPET Complete Street) - Town of Jackson
Infrastructure
Conception
$1,859,000 est. value
Jackson, WY 83001

Plum Alley Waterline
Alteration
Design
$400,000 est. value
Pavillion, WY

Slip Line Sewer Lines for Quarters 22 and Quarters 17B
Infrastructure
Design
$25,000 to $100,000 est. value
Sheridan, WY 82801

Rehabilitate the Madison Junction Water Treatment and Spring Collection System
Infrastructure
Bidding
$1,000,000 to $2,000,000 est. value
Yellowstone National Park, WY 82190

Scott A Mohror
Infrastructure
Bidding
$330,000 est. value
Jackson, WY

Greys River Waterline Replacement
Infrastructure
Post-Bid
$400,000 est. value
Alpine, WY 83128

2021 McCollister Drive Water Main Replacement
Alteration
Post-Bid
Jackson, WY 83001

Leavitt Reservoir Expansion Project
New Construction, Infrastructure
Results
$40,000,000 to $50,000,000 est. value
Greybull, WY

Completion of Raw Water Reservoir
Infrastructure
Results
Green River, WY

Raw Water Line to Rawlins Cemetery From Golf Course - City of Rawlins
Infrastructure
Conception
$1,067,389 est. value
Rawlins, WY 82301

Afton Elementary Fire Loop Waterline 2021
Alteration
Post-Bid
Afton, WY 83110

Derington Addition Watermain Replacements
Addition
Results
Casper, WY

In Alley Between Water And Railroad Monroe to Washington - City of Rawlins
Infrastructure
Conception
$360,000 est. value
Rawlins, WY 82301

Cottonwood Emergency Waterline Replacement
Infrastructure
Post-Bid
Edgerton, WY 82635

Reported 07/08/2022 11:48 AM
Project Title

Flat Creek Drive South Waterline - Town Of Jackson

Physical Address View project details and contacts
City, State (County) Jackson, WY 83001   (Teton County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $360,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. As of July 07, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents