Similar Projects
Blower and UV Disinfection System Replacement Project
Renovation
Bidding
Port Washington, WI 53074

Dryer Indefinite Quantity Services
Term Contract
Bidding
Milwaukee, WI 53207

Rest Area 106 Wastewater Upgrade
Post-Bid
Dickeyville, WI 53808

Wastewater Treatment Facility Expansion
New Construction
Post-Bid
Kaukauna, WI 54130

Aeration System Upgrades
Results
South Wayne, WI 53587

Cornell WWTP Facility Improvements
Results
Cornell, WI 54732

2020 Waste Water Treatment Facility Sludge Dewatering System Improvements
Post-Bid
Less than $500,000 est. value
Portage, WI 53901

2020 WWTF Upgrade
Results
Less than $5,400,000 est. value
Palmyra, WI 53156

Water Treatment Services
Term Contract
Post-Bid
Black River Falls, WI 54615

Wastewater Treatment Facility Phase I Improvements
Results
Egg Harbor, WI 54209

Digester Cover Rehabilitation Project
Renovation
Post-Bid
Less than $300,000 est. value
Waupaca, WI

Barneveld WWTF Upgrades
Results
Barneveld, WI

Operations Building Elevator Modernization
Renovation
Post-Bid
$100,000 est. value
Madison, WI 53713

WWTF Chemical Phosphorus Removal Upgrade
Results
Brownsville, WI 53006

On-Call Construction Services for Repairs to Aeration Basins at South Shore Water Reclamation Facility
Renovation, Term Contract
Post-Bid
Oak Creek, WI 53154

Last Updated 10/04/2021 12:33 PM
Project Title

WWTF Valve Upgrades

Physical Address View project details and contacts
City, State (County) Lake Nebagamon, WI   (Douglas County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are requested generally includes, but is not limited to the following items: removal and replacement of five (5) buried process valves, providing a telescoping valve in a new structure, and adjacent piping at the Lake Nebagamon wastewater treatment facility. Work shall also include work associated with removal and replacement of buried valves such as excavation, backfilling, and restoration of disturbed areas at the stabilization pond facility.

Details

Sewage Treatment Plant, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Excavation and Fill, Trenching and Backfilling, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents