Similar Projects
Westside Water Reclamation In-Plant Pump Station and Headworks - Design-Build
Design
$18,000,000 to $20,000,000 est. value
Daytona Beach, FL

Water System Improvements
New Construction, Infrastructure
Bidding
$800,000 est. value
Port Saint Joe, FL 32456

Cedar Hills Combined MSTU Road Improvement and MCU Lift Station and Force Main Project
Renovation, Infrastructure
Bidding
$1,090,708 est. value
Ocala, FL

Long Avenue Water and Sewer Improvements
New Construction
Post-Bid
Less than $5,000,000 est. value
FL 32456

Clark Street Lift Station Rehab
Renovation
Post-Bid
Perry, FL 32347

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Water Booster Station #1
Results
Gretna, FL

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

New Water Booster Pump Station
New Construction
Bidding
$15,000,000 est. value
Nokomis, FL 34275

Deep Injection Well Pump Station Coating
New Construction
Post-Bid
North Port, FL 34287

Manhole and Pump Station Lining, Joint Testing and Grouting Services
Results
$250,000 est. value
FL

Cooper Creek Lift Station Relocation
Renovation
Construction
$1,200,000 est. value
University Park, FL 34201

Heineman Street Potable Ground Water Storage Tank and Pump Station
New Construction, Infrastructure
Bidding
$1,000,000 est. value
Daytona Beach, FL 32114

Airport West Sanitary Sewer Collection
Renovation, Infrastructure
Post-Bid
Sebastian, FL

Reported 05/20/2022 09:32 AM
Project Title

AI Influent Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL 32080   (Saint Johns County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status All Sub-Bids Received, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $2,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work at the AI Influent Pump Station will consist of constructing a new 5.0 mgd peak hour flow (PHF) pump station and prescreening structure next to the existing station. The project will also include a single influent channel with a mechanical band screen. The wet well(s) shall be sized so that the cycle time for each pump will not be less than five minutes or that the average cycle time will not be more than 30 minutes. Each wet well shall include submersible pumps capable of handling the minimum and maximum flows.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents