Similar Projects
Last Updated | 03/08/2023 11:33 AM |
Project Title | PWC Mosquito Holding Tank Repair 5TD0 |
Physical Address | View project details and contacts |
City, State (County) | Cortland, OH 44410 (Trumbull County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Storage/Water Tanks |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Quick quote to replace office wastewater holding tank and inlet pipe at Mosquito Lake State Park, 1439 State Route 305, Cortland, OH 44410. Current tank and or inlet pipe is leaking, and needs pumped out one to two times weekly during rain events. Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive. Inquiry End Date 1/26/2023 12:00:00 AM |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |