Last Updated | 07/22/2022 06:01 AM |
Project Title | RFQ - FAI 94 (Edens Expwy) at Devon Avenue, Phase II Project |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60616 (Cook County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Bridge, Maintenance, Roadway Lighting, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids |
Project Status | Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $7,850,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Job No. D-91-157-22, FAI 94 (Edens Expwy) at Devon Avenue, Phase II Project, Cook County, Region One/District One. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 27, 2022, at 10:00 AM with the Region One/District One Office in Schaumburg. Phase II engineering services are required for the replacement of the Devon Avenue bridge over I-94. The Consultant's work is expected to consist of preparing contract plans, specifications, and estimates for the bridge replacement of the existing Devon Avenue Bridge over the I-94. The Consultant's work may include topographic supplemental survey, traffic signal modernization, geotechnical analysis and reports, lighting and other structural tasks as determined by the department. The proposed improvement will consist of replacement of the existing bridge, resurfacing, sidewalk, ADA improvements, lighting and traffic signal modernization and all other incidental work required to complete Phase II contract plans. The following structure is included in this project, S.N. 016-0834: Devon Avenue over I-94. The estimated construction cost for this project is $7,850,000. The completion date for this contract will be 24 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Typical) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 011 - RFQ - FAI 94 (Edens Expwy) at Devon Avenue, Phase II Project |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |