Similar Projects
Mcpherson Road and Fenwick Drive Eastbound Right Turn Lane and Widening Project
Infrastructure
Bidding
Laredo, TX 78041

IH 35 - Resurface Roadway
Infrastructure
Bidding
$13,692,540 est. value
TX

Laredo College Pavement Project
Infrastructure
Post-Bid
Laredo, TX

Espejo Molina Road Overlay and Striping Project
Infrastructure
Post-Bid
$188,442 est. value
Laredo, TX 78046

Southern Region Disaster Recovery Support BPA
Results

Asphalt Emulsion Tack Coat
Results
Less than $55,000 est. value
Laredo, TX 78043

Laredo Asphalt Work - Lane Widening
Infrastructure
Bidding
Laredo, TX 78043

Penitas Road Overlay and Striping Project
Infrastructure
Post-Bid
Laredo, TX 78045

Grade, Inlets, Conc Pav, Signs and Pav Mrkgs
Results
Less than $6,897,419 est. value
TX

Pueblo Nuevo Road Overlay and Striping Project
Infrastructure
Post-Bid
Laredo, TX 78043

CDBG Santa Maria Bike Lane from Chicago Street to Del Mar Boulevard
Results
Laredo, TX 78042

Las Lomas Road Overlay and Striping Project
Infrastructure
Post-Bid
Laredo, TX 78044

Wormser Road Extension Project
Results
Laredo, TX 78040

World Trade International Bridge Federal Port of Entry Fast Lanes Relocation Project
Results
Less than $6,978,011 est. value
Laredo, TX 78040

Joint Sealing and Cleaning, Laredo Travel Information Center
Results
Less than $36,000 est. value
Laredo, TX 78045

Last Updated 01/27/2022 08:05 AM
Project Title

Springfield Avenue Extension Phase 3

Physical Address View project details and contacts
City, State (County) Laredo, TX 78041   (Webb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,206,702
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of constructing a five lane concrete pavament roadway and raised median that includes constructing a 7" concrete pavement roadway(3170 LF), 12" diameter water line DR-14 PVC, 8" diameter sanitary sewer line SDR-26, storm drainage structures including 24" RCP, street lights, 12' sidewalks, utility conduit crossings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents