Similar Projects
Automated Metering Infrastructure
Bidding
Temple, GA

24-Inch Raw Water Main & 20-Inch Finished Water Main Extension
Infrastructure
Bidding
Monroe, Waco, GA

Water System Improvements
Post-Bid
Less than $1,050,000 est. value
Pavo, GA 31778

Metal Aluminized-Coated Pipe Annual Contract
Term Contract
Post-Bid
Gainesville, GA

Social Circle 2020 Water System Upgrades
Results
Social Circle, GA 30025

Fire Hydrant and Gate Valves
Results
Atlanta, GA 30303

Pump Station 2002 Force Main Replacement
Renovation, Infrastructure
Bidding
Brunswick, GA

Provision of Inspection and Repair Services for Fire Hydrants on an Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA 30042

Chenocetah Drive Water and Sewer System Improvements
Results
Cornelia, GA 30531

6th Street Water Main
Infrastructure
Bidding
Auburn, GA

Polyethylene Pipe Replacement Project
Post-Bid
Lawrenceville, GA 30046

Shellman Bluff Road and Belle Hammock Road, Water System Improvements
Results
Less than $700,000 est. value
Darien, GA 31305

SR 9 Sidewalk and Dahlonega Water Main
Infrastructure
Bidding
Dahlonega, GA

Highway 520 Water Line Replacement at Bagley Creek
Post-Bid
GA

8 Inch Water Line Extension Conyers Outlots Tract 1 and 2
Term Contract
Results
Conyers, GA 30012

Last Updated 11/03/2021 09:33 AM
Project Title

Keller Road Water Line

Physical Address View project details and contacts
City, State (County) Mount Airy, GA   (Habersham County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $116,096
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes install approximately 2,177 feet of six-inch waterline on Keller Road. In addition to installation, other work to be performed will include, but not limited to under road boring for the reconnecting of two, six-inch watermains, Wedged Gate Valves, or other necessaiy components, and service taps for eight residences (four that will need to be bored under an existing roadway), along with seeding and drainage repair of areas disturbed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents