Similar Projects
Melvin Price Lock & Dam Reach 2 Flood Control Relief Wells
Alteration
Design
Alton, IL 62002

Oak Terrace Water System New Water Supply Well and Testing
Infrastructure
Bidding
$584,000 est. value
Waukegan, IL

2022 Northeast Waterworks Phase 1 Improvements
Infrastructure, Alteration
Bidding
Naperville, IL

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

Well and Well House No. 3
Results
Less than $1,602,700 est. value
Pecatonica, IL 61063

183 CES Repair Boilers & Pumps P-48
Results
$100,000 to $250,000 est. value
Springfield, IL 62707

James Street Pump Station and General HVAC, Structural, Electrical, and Mechanical Improvements
Infrastructure, Alteration
Bidding
Joliet, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Chippewa Campground 2020 Water System Improvements
Results
Less than $350,000 est. value
Bourbonnais, IL 60914

Water System Improvements - Well
Infrastructure
Bidding
Herrick, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Well Maintenance, Well No.2
Results
Less than $104,379 est. value
Park Forest, IL 60466

Well No. 7 Raw Water Line Replacement
Infrastructure
Bidding
Milford, IL 60953

Purchase of Valves and Actuators for Wells 10 and 16
Post-Bid
Crystal Lake, IL

Reported 01/25/2022 12:00 AM
Project Title

Well Installation

Physical Address View project details and contacts
City, State (County) Urbana, IL   (Champaign County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation and pump testing of one 100-125 foot deep monitoring well with casing, screen, and related appurtenances. The work to be done hereunder includes the furnishing of all labor, material, transportation, tools, supplies, plant, equipment and appurtenances, unless hereinafter specifically exempted, necessary for the complete and satisfactory construction, disinfection, and testing of the proposed groundwater monitoring wells.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents