Similar Projects
HEEP Lab Renovation Levels 1 and 2
Renovation
Bidding
$9,700,000 est. value
College Station, TX

Rellis Academic Complex - Phase II
New Construction - 48,288 SF
Post-Bid
Bryan, TX 77807

A/E - Tamu South Campus Rec Center
New Construction - 63,600 SF
Post-Bid
Less than $25,675,300 est. value
College Station, TX 77840

Development Opportunity - College Station
Results
College Station, TX

Construction Manager at Risk - Instructional Laboratory and Innovative Learning Building (ILSQ)
New Construction - 119,993 SF
Results
Less than $100,000,000 est. value
College Station, TX

Construction Manager at Risk RFP - Innovative Technologies Development Complex
Construction
Less than $80,000,000 est. value
College Station, TX 77840

Texas A & M University Systems Peterson Building Renovation - Demolition and Abatement Package
Renovation, Demolition
Construction
College Station, TX 77843

MEOB Renovation of 3rd Floor Lobby and Restrooms, and 5th Floor Restrooms
Renovation
Post-Bid
College Station, TX 77845

Jack K. Williams Building Exterior Restoration - Phase 2
Results
Less than $1,580,000 est. value
College Station, TX 77840

A New Building for Brazos County Texas A&M Agrilife Extension Office
New Construction - 9,830 SF
Construction
Bryan, TX 77801

Renovation of Dining Facility
Renovation - 8,250 SF
Post-Bid
College Station, TX 77843

SSC-Supplemental Master Service Agreement 2019
Results
Less than $250,000 est. value
College Station, TX 77843

CMAR - New Recreation Center
New Construction
Post-Bid
College Station, TX 77840

CMAR PVAMU Engineering Classroom Research Bldg
New Construction - 101,987 SF
Results
Less than $552,499,000 est. value
College Station, TX 77840

Texas A&M University Peterson Building Renovation
Renovation
Post-Bid
College Station, TX 77840

Last Updated 01/28/2021 02:41 PM
Project Title

Blinn College Rellis Student Building - Phase 2

Physical Address View project details and contacts
City, State (County) Bryan, TX 77807   (Brazos County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Construction Management - CM at Risk.
Project Status Construction Documents, Permitting, Construction Start Expected February 2021, Construction Completion Expected August 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 College/University, 3 Stories Above Grade, 80,000 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents