Similar Projects
Last Updated | 01/03/2020 01:53 PM |
Project Title | Picayune Strand Restoration Project, Miller Tram and Road Removal and Associated Works, Collier County, FL |
Physical Address | View project details and contacts |
City, State (County) | FL (Collier County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $9,000,000 to $14,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The solicitation will consist of a Base and Two Options as follows: Base Work includes the removal and re-grading of all east-west roads to level undisturbed ground logging trams, existing roads, and adjacent ditches, swales, and spoil in the area bounded by Miller Canal to the east, the Tieback Levee to the north, 82nd Avenue SE to the south, and to the ends of the roads on the west. Miller Boulevard shall not be degraded, however, the spoil and swales along Miller Boulevard shall be leveled to undisturbed ground. Heavy equipment involved in this work will be allowed to travel across and along Miller Boulevard. Additionally, 68th Avenue SE shall not be degraded, but the adjacent spoil and swales shall be leveled. Option 1 work includes the removal and re-grading of all existing logging trams and east-west roads and their adjacent ditches and spoil in the area bounded by 84th Avenue SE to the north, Miller Canal to the east, 100th Avenue SE to the south, and the ends of the east-west roads to the west. Miller Boulevard shall not be degraded, however, the spoil and swales along Miller Boulevard shall be leveled to undisturbed ground. Option 2 work includes the removal and re-grading of all existing remaining east-west roads and their adjacent ditches and spoil in the area bounded by 102nd Avenue SE to the north, Miller Canal to the east, the end of Miller Boulevard at the gate below 128th Avenue SE to the south, and the ends of the east-west roads to the west. Miller Boulevard shall not be degraded, however, the spoil and swales along Miller Boulevard shall be leveled to undisturbed ground. The contractor shall begin performance within 90 calendar days and complete performance within 850 calendar days (Base work - 246 calendar days, Option 1 work - 266 calendar days, and Option 2 work - 336 calendar days) after receipt of Notice to Proceed (NTP). The performance period is mandatory. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |