Similar Projects
Relief Wells at Wood River Levee District - USACE St. Louis
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Wood River, IL 62095

Well 3 Pumping Unit
Infrastructure
Bidding
Saint Charles, IL 60174

Rebid D1 De-Icer Pump System and Tanks
Infrastructure
Bidding
Springfield, IL

Submersible Explosion Proof Pumps
Post-Bid
Wheaton, IL 60187

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Phase 2 Installation of Monitoring Wells and Probes
Renovation
Results
Hanover Park, IL 60133

Northwest Waterworks Booster Pump VFD Installation and South Operations Center Pump VFD Replacement
Results
Naperville, IL 60540

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

Improvements to City Well Number 31
Results
Naperville, IL 60540

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Barrington HS Sewage Ejector Pump Replacement
Results
Barrington, IL 60010

2021 Water Facilities Waste Pump Inspection and Repair
Post-Bid
Carpentersville, IL 60110

Well and Well House No. 3
Results
Less than $1,602,700 est. value
Pecatonica, IL 61063

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

183 CES Repair Boilers & Pumps P-48
Results
$100,000 to $250,000 est. value
Springfield, IL 62707

Last Updated 07/08/2021 07:24 AM
Project Title

Braden Fire Pump Replacement

Physical Address View project details and contacts
City, State (County) Normal, IL   (McLean County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

There is a 20 percent BEP goal. Contractors shall provide all labor and materials for the complete replacement of existing fire pump, controller, and associated piping, electrical, sprinkler, and construction of new fire pump room: 1. General Contractor shall be responsible for: acting as coordinating contractor, general conditions, demo of existing conditions, debris removal of self-performed work, construction of the fire pump room, all doors, fire sealing, fire proofing, misc steel fabrications, structural steel, masonry work, concrete work, painting, drywall, access doors, coordination of other trades, project schedule, final cleaning 2. Electrical Contractor shall be responsible for: electrical demolition, fire alarm demolition, new electrical wiring and conduit, lighting, emergency lighting, fire pump controllers, fire alarm work and devices, fire alarm interlock, testing, debris removal of self-performed work 3. Sprinkler Contractor shall be responsible for: fire pumps and piping demo, new fire pump and jockey pump, all piping/fittings/fire protection specialties, hydraulic calculations, fire sealing, flow testing, certification, debris removal of self-performed work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Steel Framing, Steel Decking, Metal Stairs, Metal Railings, Pipe and Tube Railings.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 21 - Fire Suppression.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents