Similar Projects
Last Updated | 07/08/2021 07:24 AM |
Project Title | Braden Fire Pump Replacement |
Physical Address | View project details and contacts |
City, State (County) | Normal, IL (McLean County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | There is a 20 percent BEP goal. Contractors shall provide all labor and materials for the complete replacement of existing fire pump, controller, and associated piping, electrical, sprinkler, and construction of new fire pump room: 1. General Contractor shall be responsible for: acting as coordinating contractor, general conditions, demo of existing conditions, debris removal of self-performed work, construction of the fire pump room, all doors, fire sealing, fire proofing, misc steel fabrications, structural steel, masonry work, concrete work, painting, drywall, access doors, coordination of other trades, project schedule, final cleaning 2. Electrical Contractor shall be responsible for: electrical demolition, fire alarm demolition, new electrical wiring and conduit, lighting, emergency lighting, fire pump controllers, fire alarm work and devices, fire alarm interlock, testing, debris removal of self-performed work 3. Sprinkler Contractor shall be responsible for: fire pumps and piping demo, new fire pump and jockey pump, all piping/fittings/fire protection specialties, hydraulic calculations, fire sealing, flow testing, certification, debris removal of self-performed work. |
||||||||||||||||||
Details |
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |