Construction Services for Well 3 at Water Treatment Plant 2
Infrastructure
Bidding
$750,000 est. value
Mount Dora, FL 32757

Berkley Road Water Treatment Plant - Well No. 3
Infrastructure
Bidding
Auburndale, FL 33823

Irrigation Well Replacement
Term Contract
Post-Bid
Land O' Lakes, FL 34639

Well Pump Diagnostic for Irrigation System NRCS FL
Post-Bid
Brooksville, FL 34601

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

DX38 Dynamometer Pump and Motor Replacement Coast Guard Engineering
Results
$45,000 est. value
Miami Beach, FL 33139

Southwest Wellfield Project, Phase 1; West Polk Lower Floridan Aquifer Project Phase 1; Construction Manager At Risk, Polk Regional Water Cooperative
Infrastructure, Alteration
Bidding
$462,000,000 est. value
Winter Haven, FL

Wet Well Cleaning
Post-Bid
North Port, FL

Reuse Irrigation Transfer Pumps
Results
Palatka, FL 32177

RAS Pump and Motor Replacement
Infrastructure
Bidding
Sarasota, FL

Well Testing, Drilling And Maintenance
Demolition, Term Contract
Post-Bid
FL

Mechanical Integrity Testing of the SRPF, WTP 11, and SROC Deep Injection Well Projects
Results
$145,000 est. value
Belle Glade, Boca Raton, Delray Beach, FL

Water Supply Well Rehabilitation
Infrastructure
Bidding
Coral Springs, FL

Progressive Cavity Pump - Sludge Feed Pump
Post-Bid
Port Saint Lucie, FL

G-310/G-335 950 CFS Pump Overhaul Project
Results
$2,660,000 to $2,940,000 est. value
West Palm Beach, FL

Last Updated 04/27/2022 08:54 AM
Project Title

Myrtle Avenue Stormwater Pump Replacement

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32260   (Duval County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of furnishing all labor, materials, and equipment and performing all operations necessary for the replacement of the stormwater pump adjacent to the Myrtle Avenue tunnel, beneath I-95. The work includes, but is not limited to earthwork, demolition activities, drainage construction including pipe lining, pump installation, electrical service, concrete construction, site improvements (gravel, sod, fence, etc.), utility adjustments, erosion control and pollution abatement.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents