Similar Projects
Elmwood Estates Addition - City of Broken Arrow
Infrastructure
Conception
$312,000 est. value
Broken Arrow, OK

Turtle Creek Phase 2 - City of Broken Arrow
Alteration
Conception
$365,400 est. value
Broken Arrow, OK

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

Pavement Rehabilitation
Infrastructure
Design
$22,434,951 CJ est. value
Tulsa, OK 74110

Intersection Modification and Traffic Signals City Street (South Memorial Drive)
Infrastructure
Bidding
$886,711 CJ est. value
Tulsa, OK 74133

Intersection Modification and Traffic Signals City Street (South Memorial Drive)
Infrastructure
Bidding
$886,711 CJ est. value
Tulsa, OK 74133

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Safety Improvement
Results
Tulsa, OK

Concrete Roadway Panel Replacement with Additional Miscellaneous Concrete Work 3
Infrastructure
Results
$809,281 est. value
Broken Arrow, OK

AEP Laydown Yard Expansion Project
Infrastructure - 424,274 SF
Construction
$38,982,295 CJ est. value
Tulsa, OK 74108

AEP Laydown Yard Expansion Project
Infrastructure - 424,274 SF
Construction
$38,982,295 CJ est. value
Tulsa, OK 74108

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

The Enclave at Southern Trails
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Broken Arrow, OK 74011

South Aspen Avenue Mixed Use Project Development
New Construction, Infrastructure - 260,000 SF
Conception
$132,000,000 CJ est. value
Broken Arrow, OK 74011

Last Updated 09/29/2022 10:08 AM
Project Title

Sidewalk and Curb Ramp Construction for CBDG / HUD Grant

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74103   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected January 2022
Bids Due View project details and contacts
Estimated Value $235,173 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing all tools, materials and labor and performing the work necessary to be done in the construction of the following: PROJECT NO. SP 21-001 SIDEWALK AND CURBRAMP CONSTRUCTION FOR CDBG/HUD GRANT The entire cost of the improvement shall be paid from Account No. 2259FR0026.Capital.GrntOut.PFImp.20003243.541106; 2036S0005Z.Sidewalk.BPIfra.4281.42813243-541106 Contract requirements shall include compliance as required by law pertaining to the practice of non-discrimination in employment. Attention is called to Resolution No. 18145 of August 23, 1988, requiring bidders to commit to the goal of employing on the project at least fifty percent bona fide residents of the City of Tulsa and/or MSA in each employment classification. Attention is called to Resolution 7404 of November 8, 2006, requiring bidders, their subcontractors and their lower-tier subcontractors to hire only citizens of the United States. The City of Tulsa itself is exempt from the payment of any sales or use taxes, and pursuant to Title 68 O.S. Section 1356(10), direct vendors to the City are also exempt from those taxes. A bidder may exclude from his bid appropriate sales taxes, which he will not have to pay while acting for and on behalf of the City of Tulsa. The amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects or refuses to enter into said contract for the construction of said public improvements for said project and furnish the necessary bonds within thirty days from and after the date the award is made. The bidder to whom a contract is awarded will be required to furnish public liability and workmen's compensation insurance; Performance, Statutory, and Maintenance bonds acceptable to the City of Tulsa, in conformity with the requirements of the proposed contract documents.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents