Similar Projects
East Water Plant Fuel Tank Replacement
Results
Plantation, FL 33317

Veeder Root Tank Monitoring System
Results
Less than $25,000 est. value
Davie, FL 33325

Fuelmaster Upgrades and New Site Installs
Infrastructure
Results
$130,000 est. value
Tamarac, FL

Prospect Road Wellfield Diesel Tank Replacement
Results
Fort Lauderdale, FL 33309

Replace Emergency Standby Generators, Fuel Tank and Ats at Various Locations Along the Florida's TPK
Infrastructure
Post-Bid

Installation and Repairs of Gas Service Lines and Mains
Results
Less than $1,000,000 est. value
Sunrise, FL

Inspection, Maintenance, and Repair Services for Diesel Fuel Tanks
Infrastructure
Results
Sunrise, FL

Diesel Exhaust Fuel Tanks
Term Contract
Post-Bid
$54,000 est. value
FL

Upgrading of Fuel Depot at Miramar`s Wastewater Reclamation Facility
Alteration
Results
Miramar, FL 33027

Replace Chemical Storage Tanks
Term Contract, Alteration
Results
$36,400 est. value
FL

Antiscalant and Orthophosphate Bulk Tanks
Alteration
Post-Bid
Deerfield Beach, FL 33442

Pump Station Fuel Tank Replacement Project
Results
Miramar, FL 33023

Rehabilitation of the Existing Sawgrass Fuel Station
Results
Sunrise, FL 33304

West Water Treatment Plant Chlorine Conversion Project
Results
Less than $1,619,258 est. value
Deerfield Beach, FL

East Water Treatment Plant Fuel Tank Replacement (Design/Build Project)
Infrastructure
Results
Plantation, FL 33317

Last Updated 03/17/2022 02:22 PM
Project Title

Fuel Tank Cleaning and Polishing

Physical Address View project details and contacts
City, State (County) Sunrise, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work under this contract includes, but is not limited to, tank fuel cleaning and polishing services. 2 The fuel storage systems are used to power emergency generators in various locations around the City, including at water and wastewater treatment plants. There are approximately 46 portable generators and 5 underground fuel storage tanks, in addition to the units stipulated in “Table A and Table B”, that will also require fuel polishing services as specified below. Refer to “Table C” for size descriptions

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents