Similar Projects
Grand Rapids Heating Upgrade
Bidding
Grand Rapids, MN 55744

Multiple HVAC Equipment Replacement Units
Bidding
Saint Paul, MN 55119

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

Filter Replacement Services at PHA Properties
Post-Bid
Saint Paul, MN

HVAC System Replacement
Results
Grand Rapids, MN 55744

HVAC Upgrades
Results
Minneapolis, MN 55411

Building 25 Dehumidification - Minnesota Veterans Home Hastings
Bidding
$113,270 est. value
Hastings, MN 55033

F108--Chemo Hood Vent Decontamination and Disposal St. Cloud
Post-Bid
Saint Cloud, MN

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

Data Room Cooling at the Judicial Building
Bidding
$103,036 est. value
MN

Natatorium HVAC
Post-Bid
Rochester, MN

Johnson High School HVAC Replacement
Results
Saint Paul, MN 55106

Braemar Ice Arena Dehumidification Upgrade
Renovation
Bidding
$240,000 est. value
Edina, Minneapolis, MN

HVAC and Mechanical Products
Term Contract
Post-Bid

Franklin Elementary School HVAC Improvements 2020
Results
Mankato, MN 56001

Reported 11/26/2020 12:00 AM
Project Title

MBC - Alerton Controls Services

Physical Address View project details and contacts
City, State (County) Minneapolis, MN   (Hennepin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all necessary Alerton BAS programming to support existing control sequences. Furnish & install various new space and equipment based sensors to replace existing sensors if they failed, or additional new ones as required to provided Temperature Controls/BAS, local alarms modifications. Provide calibration of existing sensors and controllers. Provide necessary control wiring of new controllers and sensors should minor modifications in an office layout be required. Furnish all necessary software and programming when modifications to existing systems provide for energy saving strategies. Respond to afterhours emergency calls when the MBC staff needs assistance. Term: January 1, 2021 to December 31, 2023.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents