Similar Projects
Target
Renovation
Design
Saint Louis Park, MN 55426

Tri-Care 4th Addition Street and Utility Improvements
Infrastructure
Bidding
Maple Grove, MN

8th Street SE Reconstruction
Infrastructure
Bidding
Minneapolis, MN 55467

Manhole & Structure Coring And Sawing
Term Contract
Post-Bid
Minneapolis, MN 55401

2021 Street Maintenance
Post-Bid
Saint Louis Park, MN

Zachary Lane Elementary School - 2021 LTFM
Renovation
Results
Less than $1,200,000 est. value
Minneapolis, MN 55442

Webber-44 (CSAH 152 & CSAH 57) Reconstruction
Results
Minneapolis, MN

Plymouth Avenue North Reconstruction
Post-Bid
Minneapolis, MN 55400

2021 Micro Surfacing and Chip Seal
Results
Champlin, Independence, Maple Grove, Minnetrista, MN

Hot Poured Joint Sealer
Term Contract
Post-Bid
Minneapolis, MN

Grading, Bituminous Mill And Surfacing, Ada Improvements, And Signals
Results
MN

Pre-formed Expansion Joint Filler
Term Contract
Post-Bid
Minneapolis, MN

4th Street Reconstruction - 2nd Avenue North to 4th Avenue South
Results
Minneapolis, MN

PAMS Cure Compound
Term Contract
Post-Bid
Minneapolis, MN

Blacktop Installation, Maintenance, Painting and Repair
Results
MN

Last Updated 08/11/2021 12:07 PM
Project Title

Duck Lake Road Improvements

Physical Address View project details and contacts
City, State (County) Eden Prairie, MN 55346   (Hennepin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove bituminous pavement 6600 sq yd; common excavation 4600 cu yd; excavation special 4000 cu yd; bituminous wearing course 1600 ton; portable precast concrete barrier 400 lin ft; bridge approach panels 216 sq yd; type curb barrier concrete 293 lin ft; type mod p-1 barrier concrete 515 lin ft; reinforcment bars (epoxy coated)227970 lbs; bridge slab concrete 11529 sq ft; ornamental metal railing 550 lin ft; steel h- piling 4500 lin ft; rcp storm pipe (12”-)15” 580 lin ft; rain guardian 4 ea;concrete curb & gutter 3400 sq ft; concrete walk 15000 sq ft

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents