Similar Projects
Regional Water Treatment Plant Filter Media Replacement
New Construction
Bidding
$215,000 est. value
Ottawa, OH

Whiley Road Water Loop Project
Infrastructure
Bidding
Lancaster, OH 43130

State Routes 7 and 148 Water Main Replacements
Post-Bid
Less than $125,000 est. value
Powhatan Point, OH 43942

Waterline Replacement
Post-Bid
Less than $138,700 est. value
Syracuse, OH 45779

Selwyn Road Resurfacing and Waterline Replacement
Results
$1,478,691 est. value
Cleveland Heights, OH 44118

Glyco II Forcemain Replacement - Contract A
Results
$1,639,924 est. value
Painesville, OH

Choctaw Lake Water Treatment Plant
New Construction - 2,084 SF
Construction
$1,870,000 est. value
London, OH

Sylvania Avenue Sewer and Water Main Replacements
Infrastructure
Bidding
Toledo, OH 43681

Water Meters 2021
Term Contract
Post-Bid
Lorain, OH

Mink Pressure District Water Main Improvements
Results
Less than $3,410,000 est. value
New Albany, OH 43054

Water Line
Infrastructure
Bidding
South Point, OH 45680

Bowling Green WTP Chemical Building Elevator Rehabilitation
Post-Bid
Less than $125,000 est. value
Bowling Green, OH

Circleville Emergency Connection Phase 2 - Service Transfer
Results
Less than $84,854 est. value
Circleville, OH 43113

Madison County Water System - Distribution System Part 2
Infrastructure
Bidding
$3,580,000 est. value
London, OH 43140

Filter Renovation
Post-Bid
Fairfield, OH 45014

Reported 08/05/2021 10:22 AM
Project Title

BIWW Vault Structure

Physical Address View project details and contacts
City, State (County) Sandusky, OH   (Erie County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 42” valve is currently in a partial closed position with the valve stem sheared off (it appears the pin was sheared off). the existing valve stem is currently stored at BIWW. This project is located at 2425 First Street at Big Island Water Works Plant (BIWW). The project involves installing an access structure for an existing 42” water valve located in front of the screen building at the Big Island Water Works Plant (BIWW). This existing 42” gate valve and 6” by-pass valve is located on the 42” intake line for the city’s main water supply. This gate valve controls the intake flows to the Raw Water Screening and Pumping Building. The original butterfly valve was replaced in 2004 with a new gate valve and by-pass valve. The original valve was found to be broken during the Filter and Clearwell Improvements Project that was being completed by Mosser Construction.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents