Similar Projects
Boat Launch Building Redevelopment
Infrastructure
Bidding
MI 48316

MacArthur Lock Tainter Valve Machinery Replacement
Post-Bid
$5,000,000 to $10,000,000 est. value
Sault Sainte Marie, MI 49783

Flat Rock Dam Boom Installation
Post-Bid
Brighton, MI

Korpela to Wakefield Stateline Grade Extension Culvert and Bridge Replacement
Results
MI

Union Street Dam Fish Pass
Results
Traverse City, MI 49684

Upstream Approach Wall Construction for the Soo Lock Complex, Sault Ste. Marie, MI.
Post-Bid
$100,000,000 to $250,000,000 est. value
Sault Sainte Marie, MI

2020 Chappel Dam Improvements
Results
Gladwin, MI 48624

New Lock at the Soo Chamber Construction
Post-Bid
$500,000,000 to $800,000,000 est. value
Sault Sainte Marie, MI 49783

Milham Park Dam Removal
Results
Kalamazoo, MI

Project Labor Agreement for Construction of New Soo Lock Chamber
Post-Bid
$500,000,000 est. value
Sault Sainte Marie, MI 49783

Eden Dam Modifications and Stabilization Measures
Results
MI

High Temperature Hot Water Replacement to Hill House
Post-Bid
Rochester, MI 48316

Perrin Dam Improvements
Results
Marshall, MI

Natural Science - Loading Dock Alterations
Post-Bid
East Lansing, MI

Poe Lock Rehibition Ship Arrestors Sault Ste Marie, MI
Renovation
Post-Bid
$10,000,000 to $25,000,000 est. value
Sault Sainte Marie, MI

Last Updated 05/21/2021 04:19 AM
Project Title

3.5 Mg Water Reservoir

Physical Address View project details and contacts
City, State (County) Shelby Township, MI   (Macomb County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work proposed consists of the installation of 3.5 Million Gallon (MG) Prestressed Concrete Water Reservoir, a Factory Built-Booster Station, 24 inch and 30 inch D.I. water mains, storm sewers, and related site work along with clean-up and restoration. The installation of the water reservoir (prestressed concrete tank) and Factory Built- Booster Pump Station will be constructed under this contract. The approximate quantities of work involved for this project are as follows:3.5 MG Prestressed Concrete Reservoir1 LSFactory Built-Booster Station1 LSWater Main, DI, CL 54, 24 inch, Tr Det G784 Ft Water Main, DI, CL 54, 30 inch, Tr Det G373 Ft Steel Case Pipe, 36 inch, Jacked in Place120 Ft

Details

Dam/Tunnel, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents