Similar Projects
35th Street Pump Station Improvements
Renovation
Bidding
Comstock, MI

Minges Brook Pump Station O-15 Improvements
Renovation
Bidding
Battle Creek, MI

Replacement Of Submersible Pumps At 4 Lift Stations -Alpena Combat Training Center
Renovation
Post-Bid
Alpena, MI

Pump Station Replacement
Post-Bid
Oscoda, MI

Cyl-Tec Pump Station Replacement
Results
Tecumseh, MI

Clark Road Pump Station Improvements Srf Project #5695-01
Results
Ypsilanti, MI

CWSRF-Hidden Lane, Meyers, Major Pump Station Improvements
Renovation
Bidding
Clarkston, MI

Brye Road Booster Station Improvements
New Construction
Post-Bid
Ludington, MI

Country Acres Pump Station Improvements
Results
Plymouth, MI 48170

Francis Street Lift Station & Force Main
Renovation
Bidding
Kalamazoo, MI

Replacement Sump Pumps at Townsend Towers
Renovation
Post-Bid
Dearborn, MI 48126

Fieldstone Golf Course Irrigation Pump Station Replacement
Results
Auburn Hills, MI 48326

Autumn Creek Pump Station Improvements
Renovation
Bidding
Washington, MI

Pump Station Modernization
Renovation
Post-Bid
Saline, MI

Ida Pump Station Rehabilitation
Results
Ida, MI

Last Updated 03/29/2022 10:07 AM
Project Title

Wastewater System Improvements Conrail Lift Station and Interceptor

Physical Address View project details and contacts
City, State (County) Benton Harbor, MI   (Berrien County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

760 feet of 36", 2,450 feet of 21", 200 feet of 15", 300 feet of 12", and 830 feet of 8" sanitary sewer - 1,620 feet of HDPE IPS DR 11 force main, including an 840-foot horizontal directional drill - 380 feet of 36" and 110 feet of 24" bore and jack (3 locations) - Mobile groundwater treatment - Construction of a new triplex submersible lift station including a permanent standby generator, meter chamber, and air release structure as well as all associated equipment, valves, piping, mechanical, electrical, controls, and site work. - Demolition of three existing can-type lift stations

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents