Similar Projects
Air Conditioning and Quality Improvements Package 1 - 2022 Bond - Lansing School District
Alteration
Design
$4,100,000 est. value
Lansing, MI

Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

Replace Chiller Plant Phase 2 (Construction) at the Oscar G. Johnson VA Medical Center Iron Mountain
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Iron Mountain, MI 49801

Walk-In Combination Cooler Freezer with Installation
Renovation
Sub-Bidding
$50,000 CJ est. value
Galesburg, MI 49053

Maloney Manor RoofTop Make-Up Air Modernization
Alteration
Post-Bid
Bay City, MI 48708

CBS HVAC Upgrade
Alteration
Post-Bid
Bay City, MI

Installation of Needlepoint Ionization Units
Alteration
Results
Lincoln, MI 48742

HVAC Controls Systems
Alteration
Results
Lansing, MI

Pool Dehumidification AHU Replacement
Renovation
Pending Verification
$2,200,000 CJ est. value
Allegan, MI 49010

Loy Norrix High School HVAC Improvements
Renovation - 368,436 SF
Sub-Bidding
$400,000 CJ est. value
Portage, MI 49002

MBMV 162418 Modernize DDC System
Term Contract
Post-Bid
Battle Creek, MI 49015

Lessenger Early Childhood HVAC Renovations
Alteration
Results
Oak Park, MI

HVAC Preventative Maintenance and Service
Term Contract
Sub-Bidding
Lansing, MI 48933

Energy Savings Performance Contract
Alteration
Post-Bid
Jonesville, MI 49250

Campus-Wide HVAC Filtration Upgrades-Installation
Alteration
Results
Lansing, MI

Last Updated 12/22/2022 02:10 PM
Project Title

Loy Norrix High School HVAC Improvements

Physical Address View project details and contacts
City, State (County) Portage, MI 49002   (Kalamazoo County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

All work for the complete construction of the Project will be under one or more prime contracts with the Owner based on bids received and on combinations awarded. The Construction Manager will manage the construction of the Project. Bid security in the amount of five percent (5%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. All proposals shall be accompanied by a sworn and notarized statement disclosing any familial relationship (or lack of relationship) that exists between the owner or any employee of the bidder and any member of the Board of Education of the Kalamazoo Public Schools or the Superintendent of the School District. The District shall not accept a bid that does not include a sworn and notarized disclosure statement. The successful Bidders will be required to furnish Performance and Payment Bonds for one hundred percent (100%) of their Contract amount prior to execution of Contracts. Contractors submitting bids for the performance of any Work as specified in this building Project should make such Bids to Kalamazoo Public Schools. Contractors are advised that the Contract as finally entered into with any successful Bidder shall be entered into with the Kalamazoo Public School. The Owner reserves the right to accept or reject any Bid (or combination of Bids) and to waive any irregularities in bidding. All Bids may be held for a period not to exceed 120 days before awarding contracts

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents