Similar Projects
Old Naples Hotel
New Construction, Build-Out, Demolition - 6,230 SF
Design
Naples, FL

Z--Bathroom Repairs, St Petersburg, FL
Design
$1,000,000 to $5,000,000 est. value
Saint Petersburg, FL

City of Seminole Waterfront Park Restroom Project
Bidding
Seminole, FL 33772

FAMU Recreation Field Restroom Facility
Post-Bid
Tallahassee, FL

North Campus - Building 62 Bathrooms
Post-Bid
Coconut Creek, FL

Newton Beach Park Restroom Restoration
Results
Fort Myers Beach, FL

Restroom Renovation at Lake Shore Park
Results
$40,000 est. value
Miramar, FL

Barrington at Mirror Lake Leasing Center & Pool Bathrooms
New Construction, Demolition - 7,500 SF
Construction
Apopka, FL 32703

KOA Campground
New Construction
Construction
Fort Pierce, FL 34981

2nd Floor Ada Unisex Toilet at Cornerstone 1
Renovation - 68 SF
Post-Bid
$35,000 est. value
Plantation, FL 33324

Kester Park Concession Renovation and New Restroom Building Construction
Renovation
Results
Less than $450,000 est. value
Pompano Beach, FL

Jacksonville International Airport Airside Terminal Restrooms Renovations
Construction
Jacksonville, FL

Pearl Street Meter Shop Bathroom and Breakroom Upgrades
Renovation
Post-Bid
Jacksonville, FL

Electric Utility Meter Operations Restroom Renovations
Renovation
Results
Tallahassee, FL

Parkside Corporate Center III - Restrooms
Renovation - 1,200 SF
Construction
Less than $500,000 CJ est. value
Miami Lakes, FL 33016

Last Updated 04/09/2019 10:46 AM
Project Title

Andrew Jackson Office Building - Restroom

Physical Address View project details and contacts
City, State (County) Miami Lakes, FL 33016   (Miami-Dade County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method
Project Status Construction Commenced March 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Restroom renovations - 8 restrooms, 4 floors Schedule: Early October Start
Details 1 Restroom/Bath House, 1 Story Above Grade, 1,520 SF Renovation 8 Unit(s).
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents