Similar Projects
Tribal Transit Service Building
New Construction - 5,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Lac du Flambeau, WI 54538

Construct Wildlife Shop Facility
New Construction, Infrastructure
Conception
$1,970,900 est. value
Waukesha, WI

Multi-Tenant Commercial Building - Storage Units
New Construction - 46,080 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Caledonia, WI

Redevelopment Construction Of A Climate Controlled Self-Storage Facility
New Construction - 43,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Brookfield, WI 53005

West Tower Renovation - GPC
Renovation - 7,200 SF
Bidding
$8,385,000 est. value
Milwaukee, WI 53211

Construct Fisheries Equipment Storage Facility
New Construction
Bidding
$500,000 est. value
Oshkosh, WI

Cold Storage Shed
New Construction
Post-Bid
Richland Center, WI 53581

Sheriff's Office Storage Building
New Construction
Post-Bid
Lake Mills, WI 53551

Green Bay Water Utility Addition/Renovation
Renovation, Addition - 31,900 SF
Results
Green Bay, WI 54301

Town Garage
Results
Less than $470,000 est. value
Gleason, WI

Viking Electric Proposed Building
New Construction - 6,250 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Wausau, WI 54401

Fedex #0436
Addition
Construction
Wauwatosa, WI 53226

Horseshoe Beverage Company
Addition - 19,907 SF
Pending Verification
Neenah, WI 54956

Hakaduli Multi-tenant Building
Renovation - 3,000 SF
Pending Verification
Glendale, WI 53209

Stor-It Right Storage Facility / Pabst Farms Commerce Center
New Construction
Design
$13,000,000 est. value
Oconomowoc, WI 53066

Last Updated 06/27/2022 12:46 PM
Project Title

Construct Fisheries Equipment Storage Facility

Physical Address View project details and contacts
City, State (County) Oshkosh, WI   (Winnebago County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general the work consists of construction of a new pre-engineered wood structure used for cold storage. This includes site work, installation of new well, and electrical work. Base Bids will be received as a single lump sum bid for: Electrical. No deposit is required to obtain documents for bidding purposes. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents